16 Publications from A96 Dualling Inverness to Aberdeen

SRRB – Final Assessment of Geometric Layout of Type A Lay-bys

1 Mar 2018

The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.

Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling

25 Jul 2017

This report summarises the scope of the event and the reactions and comments of those who attended

Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing

26 Jun 2017

The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing

Sustainability Strategy - November 2016 - A96 Dualling

19 Jun 2017

Sustainability objectives have been developed to reflect the existing A96 Dualling Programme objectives, the needs of the A96 corridor and its communities, and the opportunities offered by a programme of this scale

A9 Dualling Update - March 2017

4 Apr 2017

Welcome to the latest newsletter about the A9 Dualling programme and the work going on to deliver this major infrastructure programme.

A96 Dualling Inverness to Aberdeen Preliminary Engineering Services - Non-Motorised User Strategy

13 Jun 2016

The main objective of this paper is to develop a strategy for NMUs, by outlining high level principles and a hierarchy of provision considering potential usage and type

A9 Dualling Non-Motorised User (NMU) Access Strategy

27 May 2016

Formalising Transport Scotland’s position in relation to NMU access arrangements

Post Adoption Statement - Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

26 Feb 2016

This statement is the last formal output of the SEA process for the Dualling Programme and outlines how the assessment findings and the comments received through the consultation process have been taken into account

Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

6 May 2015

The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015

DMRB Stage 1 Assessment Report - A96 Dualling Inverness to Aberdeen

1 May 2015

Design Manual for Roads and Bridges Stage 1 Assessment for the initial development and assessment of broadly defined improvement strategies for the upgrade of the A96 to a Category 7A all-purpose dual carriageway.

Page 1 of 2