20 Publications from A96 Dualling Inverness to Aberdeen

Forth Replacement Crossing Project - One Year After Opening Evaluation

10 Dec 2020

A report on the findings of the Forth Replacement Crossing Project One Year After Opening evaluation.

A96 Online Dualling at Inverurie Supplementary Study October 2020

30 Oct 2020

A supplementary study investigating varying standards of online dualling through Inverurie to determine impacts and performance in relation to the scheme objectives.

Lessons Learned from the Forth Replacement Crossing Project 2007 to 2017

16 Oct 2020

Noting the extent and scale of the work required to complete each stage of the Forth Replacement Crossing project.

SRRB – Final Assessment of Geometric Layout of Type A Lay-bys

1 Mar 2018

The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.

Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling

25 Jul 2017

This report summarises the scope of the event and the reactions and comments of those who attended

Forward look - July 2017 - Forth Replacement Crossing

27 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing

26 Jun 2017

The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing

Sustainability Strategy - November 2016 - A96 Dualling

19 Jun 2017

Sustainability objectives have been developed to reflect the existing A96 Dualling Programme objectives, the needs of the A96 corridor and its communities, and the opportunities offered by a programme of this scale

Forward look - June 2017 - Forth Replacement Crossing

2 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing

8 Mar 2017

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Page 1 of 2