197 Publications

Filter by:

Kerb heights - Phase 3

9 Jul 2025

Scottish Road Research Board completed research

Impact assessment of zero emission development activities

9 Jul 2025

Scottish Road Research Board completed research

Kerb heights - Phase 4

9 Jul 2025

Scottish Road Research Board completed research

Draft Orders - Pass of Birnam to Tay Crossing - A9 Dualling

30 May 2025

Draft Orders, including the draft Compulsory Purchase Order, for the A9 Dualling Pass of Birnam to Tay Crossing project - the statutory consultation period closes on 25 July 2025

Environmental Impact Assessment Report - Pass of Birnam to Tay Crossing - A9 Dualling

30 May 2025

An Environmental Impact Assessment (EIA) for the proposed scheme is required under European and Scottish Legislation. The EIA Report details the findings of the EIA, which has been undertaken in line with the Design Manual for Roads and Bridges (DMRB).

Early Life Pavement Failures

28 Feb 2025

The aim of the study is to analyse profile and texture data collected from the Scottish Trunk Road Network to understand the implications of transitioning to MPD

Investment fund evaluation - Final report - Mobility as a Service (MaaS)

24 Feb 2025

Findings from the MaaS Investment Fund evaluation, which we commissioned to establish what the evidence from the pilot projects demonstrates in terms of the overall viability and potential impact of MaaS in Scotland.

Monitoring and Evaluation Report 2024 - National Transport Strategy

19 Dec 2024

The report is an analytical report, updating on the baseline position of measures which track the progress of the National Transport Strategy. As such, the report will include statistical information which will be represented in tables, graphs and graphics.

Baseline Data Collection and Analysis - Evaluation of the Levenmouth Rail Link Reopening

18 Dec 2024

This report summarises the findings from the baseline study conducted prior to the reopening of the Levenmouth rail link.

Baseline Data Collection and Analysis - Technical Appendices - Evaluation of the Levenmouth Rail Link Reopening

18 Dec 2024

This document contains the technical appendices for the Levenmouth Rail Link Baseline Evaluation Report.

Page 1 of 20