15 Publications from A876 Upper Forth Crossing at Kincardine

Forth Replacement Crossing Project - One Year After Opening Evaluation

10 Dec 2020

A report on the findings of the Forth Replacement Crossing Project One Year After Opening evaluation.

Lessons Learned from the Forth Replacement Crossing Project 2007 to 2017

16 Oct 2020

Noting the extent and scale of the work required to complete each stage of the Forth Replacement Crossing project.

SRRB – Final Assessment of Geometric Layout of Type A Lay-bys

1 Mar 2018

The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.

Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling

25 Jul 2017

This report summarises the scope of the event and the reactions and comments of those who attended

Forward look - July 2017 - Forth Replacement Crossing

27 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing

26 Jun 2017

The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing

Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A876(T) Clackmannanshire Bridge

13 Jun 2017

Three years after opening evaluation report of the A876(T) Clackmannanshire Bridge (Upper Forth Crossing)

Forward look - June 2017 - Forth Replacement Crossing

2 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing

8 Mar 2017

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure

23 Dec 2016

Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.