The A75 Trunk Road (Glasgow Road Roundabout, Cuckoo Bridge) (30mph Speed Limit) Order 202[]

The Scottish Ministers hereby give notice that they propose to make the above Order under section 84(1)(a) of the Road Traffic Regulation Act 1984 which will have the effect of imposing a 30mph speed limit on the following length of road: That length of the A75 Gretna – Dumfries – Stranraer Trunk Road from a point 58 metres or thereby west of the Glasgow Road Roundabout, Cuckoo Bridge, eastwards, including the Glasgow Road Roundabout, Cuckoo Bridge circulation lanes, to a point 64 metres or thereby east of the Glasgow Road Roundabout, Cuckoo Bridge, a distance of 263 metres of thereby.

Full details of the proposal are contained in the Order which, together with a plan showing the lengths of road involved and a statement of the Scottish Ministers’ reasons for proposing to make the Order, may be examined free of charge during normal business hours from 11 September 2026 until 9 October 2026 at the offices of Transport Scotland, Fifth Floor, 177 Bothwell Street, Glasgow, G2 7ER, Ewart Library, Catherine Street, Dumfries, DG1 1JA and Lochside Post Office, 202-204 Lochside Road, Dumfries, DG2 0EB.

Any person wishing to object to the proposed Order should send details of the grounds for objection in writing to the Director of Roads, c/o Catriona Paterson, Transport Scotland, Fifth Floor, 177 Bothwell Street, Glasgow, G2 7ER or via email to TRO-Objections@transport.gov.scot quoting reference SW/A75CuckooBridge/CP by 9 October 2026.

A member of the staff of the Scottish Ministers
Transport Scotland
Fifth Floor
177 Bothwell Street
Glasgow
G2 7ER

Statement of Reasons

The Scottish Ministers aim to promote the safe and efficient use of the roads for which they are responsible.

The Scottish Ministers are satisfied that the introduction of a 30mph Speed Limit for the purpose of reducing the speed of motor vehicles on the A75 through Glasgow Road Roundabout, Cuckoo Bridge will be in the interests of road safety and will be incorporated within the signalisation of the junction.



Start date 11 Sep 2026 End date 9 Oct 2026 Status Region