The A78 Trunk Road (Greenock) (Temporary Prohibition of Waiting, Loading and Unloading) (No. 2) Order 2025

The Scottish Ministers give notice that they have made the above Order under sections 2(1) and (2), 4(1) and 14(1)(a) and (4) of the Road Traffic Regulation Act 1984, which will have the effect of temporarily prohibiting waiting, loading and unloading on that length of the A78 trunk road from a point at its junction with Pennyfern Road, Greenock to a point at its junction with Neil Street, Greenock, a distance of 160 metres or thereby.

The Order, which is required because works are being proposed to be executed on or near the road will be in operation from 14th November until 16th November 2025 and will only have effect in relation to such part or parts of the length of road as is indicated by the appropriate traffic signs.

The Order does not apply to vehicles being used in an emergency for fire brigade, ambulance, police or coastguard purposes or vehicles being used for carrying out the works.

Alternative routes

An alternative route is not required.

For information about roadworks on motorways and trunk roads visit Traffic Scotland.

S R LEES
A member of the staff of the Scottish Ministers
Transport Scotland
177 Bothwell Street
Glasgow
G2 7ER

UN Convention on the Rights of the Child (Incorporation) (Scotland) Act 2024 Compatibility Consideration and Narration of Statement of Compatibility

The Scottish Ministers have made the following statement regarding children’s rights.

“In accordance with section 23(2) of the United Nations Convention on the Rights of the Child (Incorporation) (Scotland) Act 2024 (the Act), the Scottish Ministers certify that, in their view, The A78 Trunk Road (Greenock) (Temporary Prohibition of Waiting, Loading and Unloading) (No. 2) Order 2025, is compatible with the UNCRC requirements as defined by section 1(2) of the Act.”


Start date 14 Nov 2025 End date 17 Nov 2025 Status Status Status Status Status Status