The A83 Trunk Road (Tarbert) (Temporary Prohibition on Use of Road) Order 2021

The Scottish Ministers give notice that they have made the above Order under sections 2(1) and (2), 4(1) and 16A of the Road Traffic Regulation Act 1984, temporarily prohibiting traffic on that length of the A83 Tarbet – Lochgilphead – Campbeltown Trunk Road from its junction with Harbour Street, Tarbert in a generally westwards direction to its junction with Lady Ileene Road, Tarbert, a distance of 140 metres or thereby.

The Order, which is required to facilitate the Tarbert War Memorial Rededication Ceremony 2021 and to enable members of the public to participate in this event, will be in operation from 7 August until 8 August 2021, it is anticipated that the road will be closed for approximately 10 minutes at some point in the day and will only have effect in relation to such part or parts of the length of road as is indicated by the appropriate traffic signs.

The Order does not apply to a vehicle being used in an emergency for fire brigade, ambulance, police or coastguard purposes, or a vehicle being used for facilitating the holding of the relevant event.

Alternative routes

An alternative route is not required.

For information about roadworks on motorways and trunk roads visit www.trafficscotland.org.

A member of the staff of the Scottish Ministers
Transport Scotland
Buchanan House
58 Port Dundas Road
Glasgow
G4 0HF


Start date 7 Aug 2021 End date 8 Aug 2021 Status Region