108 results from Projects

A9 Killiecrankie to Glen Garry

Project

This 22 km road from Killiecrankie to Glen Garry is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

A9 Glen Garry to Dalwhinnie

Project

This 12.2km stretch between Glen Garry and Dalwhinnie is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

A9 Dalwhinnie to Crubenmore

Project

This 11 km road from Dalwhinnie to Crubenmore is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

Media Results

A9 Crubenmore to Kincraig

Project

This 16 km road from Crubenmore to Kincraig is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

A9 Kincraig to Dalraddy

Project

The 7.5km Kincraig to Dalraddy section of the A9 has now been upgraded to dual-carriageway as part of the wider A9 Dualling Programme

A9 Dalraddy to Slochd

Project

This 25 km road from Dalraddy to Slochd is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

A9 Tomatin to Moy

Project

This 8.5km road between Tomatin and Moy is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

A9 Helmsdale to Ord of Caithness Improvements Phase 2

Project

This project involves the construction of 2.1 kilometres of 6 metre-wide single carriageway, with 1 metre hard strips and a minimum soft verge width of 1.65 metres. At the northern end of the scheme, a 280 metre-long 10 metre-wide climbing lane has been provided.

A9 Kessock Bridge Resurfacing

Project

The Kessock Bridge opened to traffic in 1982. It is a cable stayed bridge and carries the A9 dual carriageway trunk road across the Beauly Firth at Inverness.

A9 Moy 2+1 Improvements and Maintenance

Project

This project is now complete. It involved the construction of a new 1.06km northbound overtaking lane, with associated drainage, surfacing and safety fencing improvements.

Page 8 of 11