108 results from Projects
Filter by:
A9 Killiecrankie to Glen Garry
ProjectThis 22 km road from Killiecrankie to Glen Garry is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness
A9 Glen Garry to Dalwhinnie
ProjectThis 12.2km stretch between Glen Garry and Dalwhinnie is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness
A9 Dalwhinnie to Crubenmore
ProjectThis 11 km road from Dalwhinnie to Crubenmore is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness
Media Results
A9 Crubenmore to Kincraig
ProjectThis 16 km road from Crubenmore to Kincraig is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness
A9 Kincraig to Dalraddy
ProjectThe 7.5km Kincraig to Dalraddy section of the A9 has now been upgraded to dual-carriageway as part of the wider A9 Dualling Programme
A9 Dalraddy to Slochd
ProjectThis 25 km road from Dalraddy to Slochd is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness
A9 Tomatin to Moy
ProjectThis 8.5km road between Tomatin and Moy is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness
A9 Helmsdale to Ord of Caithness Improvements Phase 2
ProjectThis project involves the construction of 2.1 kilometres of 6 metre-wide single carriageway, with 1 metre hard strips and a minimum soft verge width of 1.65 metres. At the northern end of the scheme, a 280 metre-long 10 metre-wide climbing lane has been provided.
A9 Kessock Bridge Resurfacing
ProjectThe Kessock Bridge opened to traffic in 1982. It is a cable stayed bridge and carries the A9 dual carriageway trunk road across the Beauly Firth at Inverness.
A9 Moy 2+1 Improvements and Maintenance
ProjectThis project is now complete. It involved the construction of a new 1.06km northbound overtaking lane, with associated drainage, surfacing and safety fencing improvements.