Appendix A - Multi-Modal Base Case Drawings
Appendix A - Multi-Modal Base Case Drawings
CABLE STAYED BRIDGE |
THREE CORRIDOR OPTION |
GENERAL ARRANGEMENT 650m MAIN SPANS |
pdf format only (1.1mb) | |
CABLE STAYED BRIDGE |
THREE CORRIDOR OPTION |
FUNCTIONAL CROSS SECTION |
pdf format only (468k) | |
CABLE STAYED BRIDGE |
THREE CORRIDOR OPTION |
DECK CROSS SECTIONS |
pdf format only (680k) | |
CABLE STAYED BRIDGE |
NEEDLE TOWER |
GENERAL ARRANGEMENT CROSS SECTION N2 |
pdf format only (268k) | |
APPROACH SPANS |
THREE CORRIDOR OPTION |
CONCRETE DECK GENERAL ARRANGEMENT |
pdf format only (452k) | |
CABLE STAYED BRIDGE |
FOUNDATIONS |
NEEDLE TOWER |
pdf format only (348k) | |
APPROACH SPANS |
FOUNDATIONS |
COMPOSITE & CONCRETE DECKS |
pdf format only (664k) | |
CABLE STAYED BRIDGE |
THREE CORRIDOR OPTION |
ACCESS FACILITIES CONCEPT LAYOUT |
pdf format only (440k) |