Appendix D - D2M Scheme Assessment Drawings

Appendix D - D2M Scheme Assessment Drawings

FRC/C/076/ D2M/ 001

CABLE STAYED BRIDGE

D2M OPTION

GENERAL ARRANGEMENT

TWO CORRIDOR SINGLE DECK

FRC/C/076/ D2M/ 002

CABLE STAYED BRIDGE

D2M OPTION

GENERAL ARRANGEMENT

TWO CORRIDOR TWIN DECK

FRC/C/076/ D2M/ 003

CABLE STAYED BRIDGE

D2M OPTION

GENERAL ARRANGEMENT

SINGLE CORRIDOR

FRC/C/076/ D2M/ 021

CABLE STAYED BRIDGE

D2M OPTION

FUNCTIONAL CROSS SECTION

 

FRC/C/076/ D2M/ 022

CABLE STAYED BRIDGE

D2M OPTION

FUNCTIONAL CROSS SECTION

INCLUDING LRT OR WALKWAY

FRC/C/076/ D2M/ 101

CABLE STAYED BRIDGE

D2M OPTION

DECK SECTIONS

TWO CORRIDOR SINGLE BOX – SHAPE A

FRC/C/076/ D2M/ 111

CABLE STAYED BRIDGE

D2M OPTION

DECK SECTIONS

TWO CORRIDOR TWIN BOX GIRDER

FRC/C/076/ D2M/ 121

CABLE STAYED BRIDGE

D2M OPTION

DECK SECTIONS

TWO CORRIDOR LADDER BEAM – BOX GIRDERS

FRC/C/076/ D2M/ 122

CABLE STAYED BRIDGE

D2M OPTION

DECK LAYOUT

TWO CORRIDOR LADDER BEAM – BOX GIRDERS

FRC/C/076/ D2M/ 123

CABLE STAYED BRIDGE

D2M OPTION

DECK SECTIONS

TWO CORRIDOR LADDER BEAM – PLATE GIRDERS

FRC/C/076/ D2M/ 124

CABLE STAYED BRIDGE

D2M OPTION

DECK LAYOUT

TWO CORRIDOR LADDER BEAM – PLATE GIRDERS

FRC/C/076/ D2M/ 131

CABLE STAYED BRIDGE

D2M OPTION

DECK SECTIONS

SINGLE CORRIDOR SINGLE BOX – SHAPE A

FRC/C/076/ D2M/ 141

CABLE STAYED BRIDGE

D2M OPTION

DECK SECTIONS

SINGLE CORRIDOR LADDER BEAM OPTIONS

FRC/C/076/ D2M/ 201

CABLE STAYED BRIDGE

D2M OPTION

MONO-TOWER

(M1) GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 202

CABLE STAYED BRIDGE

D2M OPTION

MONO-TOWER

(M2) GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 211

CABLE STAYED BRIDGE

D2M OPTION

H-SHAPE TOWER

(H1) GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 241

CABLE STAYED BRIDGE

D2M OPTION

DIAMOND TOWER

GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 261

CABLE STAYED BRIDGE

D2M OPTION

A FRAME TOWER

GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 301

APPROACH SPANS

D2M OPTION

COMPOSITE BOX GIRDER DECK

GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 321

APPROACH SPANS

D2M OPTION

CONCRETE BOX GIRDER DECK

GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 341

APPROACH SPANS

D2M OPTION

COMPOSITE PLATE BEAM DECK

GENERAL ARRANGEMENT

FRC/C/076/ D2M/ 401

CABLE STAYED BRIDGE

D2M OPTION

FOUNDATIONS

MONO-TOWER

FRC/C/076/ D2M/ 421

CABLE STAYED BRIDGE

D2M OPTION

FOUNDATIONS

H-SHAPE TOWER

FRC/C/076/ D2M/ 441

CABLE STAYED BRIDGE

D2M OPTION

FOUNDATIONS

DIAMOND TOWER

FRC/C/076/ D2M/ 451

CABLE STAYED BRIDGE

D2M OPTION

FOUNDATIONS

A-FRAME TOWER

FRC/C/076/ D2M/ 461

CABLE STAYED BRIDGE AND APPROACH SPANS

PIER FOUNDATIONS

 

FRC/C/076/ D2M/ 501

CABLE STAYED BRIDGE

D2M OPTION

ACCESS FACILITIES

CONCEPT LAYOUT