Footnotes
Footnotes
1. As stated in the DMRB Stage 3 Environmental Assessment report for this scheme.
2. Scottish Transport Statistics No 31: 2012 Edition, http://www.transportscotland.gov.uk/files/j251205.pdf
3. Scottish Transport Statistics No 31: 2012 Edition, http://www.transportscotland.gov.uk/files/j251205.pdf
4. A75(T) Trunk Road Improvement Schemes, Cairntop to Barlae, Traffic and Economic Assessment, Mouchel Parkman / SIAS (2007)
5. A75 Cairntop to Barlae Improvement Scheme Environmental Statement, Mouchel Parkman et al. (2006)
6. A75 Cairntop to Barlae Improvement Scheme Environmental Statement, Mouchel Parkman et al. (2006)