419 Publications

A9 Tay Crossing to Ballinluig 107 Notices

10 May 2021

Section 107 notice for land forming part of the property known as Haugh of Tulliemet Farm, which has been acquired by voluntary purchase.

Preliminary Engineering Services - DMRB Stage 1 Assessment - A83 Access to Argyll and Bute

29 Apr 2021

Design Manual for Roads and Bridges Stage 1 Assessment Report for the A83 Access to Argyll and Bute project

Strategic Environmental Assessment - A83 Access to Argyll and Bute

29 Apr 2021

Jacobs / AECOM was commissioned by Transport Scotland to undertake a Strategic Environmental Assessment for the A83 Access to Argyll and Bute project

Salt Group situation report

27 Apr 2021

The latest Salt Group situation report

COVID-19 Sub-National Transport Trends - 1 March - 4 April 2021

19 Apr 2021

This report highlights transport trends seen at a local level, rather than the overarching national trends over the same period.

Meeting minutes - Taskforce - 3 December 2020 - A83 Improvements

8 Apr 2021

Minutes from the A83 Improvements taskforce meeting on 3 December 2020.

STAG Appraisal - Case for Change Report - March 2021 - A9 - North Kessock to Tore study

24 Mar 2021

Review of both current and future operations, taking account of potential and future developments within the surrounding area

Consultation on Actively Managed Hard Shoulder and Speed Limit Regulations 2021 - Consultation Report

23 Mar 2021

Feedback has been reviewed and summarised along with the next steps in this report.

Project newsletter - Spring 2021 - A92/A96 Haudagain Improvement

23 Mar 2021

The fifth newsletter for the A92/A96 Haudagain Improvement project

Guidance Note on Archaeology and Trunk Roads

22 Mar 2021

This Guidance Note outlines procedures to be followed by Transport Scotland to ensure the efficient and cost-effective management of fieldwork for the mitigation of impacts on archaeology during the ongoing development of Scotland’s trunk road network.