940 Publications Filtered by Publication type: 1269
Filter by:
Project newsletter - Summer 2015 - M8 M73 M74
5 Jun 2015Traffic Monitoring Annual Report - 2013/14 - Forth Replacement Crossing
25 May 2015The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified
Evaluation of Laurencekirk Railway Station
19 May 2015A study to undertake an evaluation of the impact of the railway station
Larkhall – Milngavie Railway Project Evaluation Study Final Report
19 May 2015This report provides an evaluation of the Larkhall – Milngavie railway project and provides a recommendations for improvement of the draft Rail Evaluation Guidance
Airdrie-Bathgate Rail Link Improvement Stage 1 Outcome Evaluation Report
19 May 2015This evaluation report provides an early assessment of the extent to which the project is on track to reach its objectives, through the examination of relevant monitoring data
Improving the evidence base on journey time reliability on the Trunk Road Network in Scotland
15 May 2015The study looked at the concept of Journey Time Reliability and its valuation
Road Safety Framework: Annual Report 2014
11 May 2015The annual report for Scotland's Road Safety Framework
Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen
6 May 2015The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015
DMRB Stage 1 Assessment Report - A96 Dualling Inverness to Aberdeen
1 May 2015Design Manual for Roads and Bridges Stage 1 Assessment for the initial development and assessment of broadly defined improvement strategies for the upgrade of the A96 to a Category 7A all-purpose dual carriageway.
Quarterly newsletter No. 1 - 2015 - AWPR
22 Apr 2015A quarterly newsletter will be available via local libraries throughout the north east