942 Publications Filtered by Publication type: 1269

Filter by:

Road drainage and flood risk management

1 Jul 2015

Study to investigate the conflict between road drainage design and flood risk management. The study will cover both new build and retrofitted schemes.

Evaluation of EME2 type mixtures incorporating softer grade binders - Phase I progress report

10 Jun 2015

Project newsletter - Summer 2015 - M8 M73 M74

5 Jun 2015

Traffic Monitoring Annual Report - 2013/14 - Forth Replacement Crossing

25 May 2015

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Evaluation of Laurencekirk Railway Station

19 May 2015

A study to undertake an evaluation of the impact of the railway station

Larkhall – Milngavie Railway Project Evaluation Study Final Report

19 May 2015

This report provides an evaluation of the Larkhall – Milngavie railway project and provides a recommendations for improvement of the draft Rail Evaluation Guidance

Airdrie-Bathgate Rail Link Improvement Stage 1 Outcome Evaluation Report

19 May 2015

This evaluation report provides an early assessment of the extent to which the project is on track to reach its objectives, through the examination of relevant monitoring data

Improving the evidence base on journey time reliability on the Trunk Road Network in Scotland

15 May 2015

The study looked at the concept of Journey Time Reliability and its valuation

Road Safety Framework: Annual Report 2014

11 May 2015

The annual report for Scotland's Road Safety Framework

Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

6 May 2015

The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015

Page 79 of 95