9 Publications from A96 East of Huntly to Aberdeen
Filter by:
Preferred option exhibition materials - December 2020 – East of Huntly to Aberdeen - A96 Dualling
21 Dec 2020Materials presented at the preferred option exhibition in December 2020 for the East of Huntly to Aberdeen section of the A96 Dualling.
DMRB Stage 2 Assessment Report – East of Huntly to Aberdeen - A96 Dualling
11 Dec 2020Design Manual for Roads and Bridges Stage 2 Assessment for the East of Huntly to Aberdeen section of the A96 Dualling Scheme.
A96 Online Dualling at Inverurie Supplementary Study October 2020
30 Oct 2020A supplementary study investigating varying standards of online dualling through Inverurie to determine impacts and performance in relation to the scheme objectives.
DMRB Stage 2 Early Sifting Reports – East of Huntly to Aberdeen - A96 Dualling
7 Aug 2019DMRB Stage 2 Early Sifting Reports – East of Huntly to Aberdeen - A96 Dualling
DMRB Stage 2 Pairing Assessments – East of Huntly to Aberdeen - A96 Dualling
7 Aug 2019DMRB Stage 2 Pairing Assessments – East of Huntly to Aberdeen - A96 Dualling
Exhibition materials - May 2019 - East of Huntly to Aberdeen - A96 Dualling
28 May 2019Materials presented at a series of drop-in sessions in May 2019 to update local communities and road users on the ongoing design work for dualling the 26 mile section of the A96 between East of Huntly and Aberdeen
Online at Inverurie - Dualling Feasibility and Appraisal - East of Huntly to Aberdeen - A96 Dualling
15 Apr 2019This report records the decision to de-select online dualling of the A96 through Inverurie as an option for the A96 Dualling East of Huntly to Aberdeen scheme
Exhibition materials - Public exhibitions - October 2018 - East of Huntly to Aberdeen - A96 Dualling
8 Oct 2018Materials presented at the exhibitions
Exhibition materials - Meet the team - November 2017 - East of Huntly to Aberdeen - A96 Dualling
8 Nov 2017Information presented at the Meet the team events in November 2017