A96 Online Dualling at Inverurie Supplementary Study October 2020
Following feedback, a supplementary study investigating varying standards of online dualling through Inverurie has been undertaken to determine impacts and performance in relation to the scheme objectives. This work also identifies to what extent respective reduction in dualling standards would lessen the impacts and associated challenges of constructing online through Inverurie.
The study concludes that online dualling performs poorly against a number of the scheme objectives and will not be taken forward through the DMRB Stage 2 assessment process.
The following documents provide details of the further work undertaken to consider online dualling option through Inverurie, as part of the A96 Dualling East of Huntly to Aberdeen scheme.
Supplementary study
- View Online At Inverurie Supplementary Study
- View Appendix A - D2APb (At Grade) Layout, Including Drainage Basins
- View Appendix A - D2APc (GSJ) Layout, Including Drainage Basins
- View Appendix A - D2UAP Layouts
- View Appendix A - Environmental Plans
- View Appendix A - Indicative Phasing
- View Appendix A - Utilities Drawings
- View Appendix B - Air Quality Assessment
- View Appendix C - Noise Assessment
- View Appendix D - Traffic Assessment Results
- View Appendix E - Comparison Summary Table
Published Date
30 Oct 2020
Type
Projects
Mode of transport