90 results from Projects

}

A75 Mossyard

Project

This project relates to a safety improvement at the access to Mossyard beach and caravan park on the A75, between Cardoness and Carsluith, providing safer access and road improvements.

A77 Maybole Bypass

Project

This project involves the construction of a new off-line bypass of the town of Maybole and associated junctions to connect to the existing A77 trunk road.

A82 Allt Chonoglais Bridge Replacement

Project

This £1.8 million project replaced the previous structure with a stronger bridge. The improvement was part of the A82 Bridge Strengthening & Replacement Programme and the new bridge was opened to traffic on 15 August 2013.

Media Results

A82 Ba Bridge Replacement

Project

A survey identified the A82 Ba Bridge as being under strength to carry future traffic loads and it was replaced by a stronger structure. A 52 week contract, awarded in January 2010 to RJ McLeod, was completed ahead of schedule in December 2010.

A82 Crianlarich Bypass

Project

A new bypass has been constructed where the A82 and A85 meet at Crianlarich, to tackle the congestion experienced by road users during the busy tourist season.

A82 Improvements

Project

Transport Scotland is operating an improvements programme to address a number of long-standing issues along the route of the A82.

A82 Pulpit Rock

Project

The improvement work at Pulpit Rock has seen the removal of traffic signals and the re-introduction of two-lane carriageway.

A82 Stuckindroin Bridge

Project

This £1.1 million project upgraded the bridge, widening it to accommodate future traffic flows and easier maintenance.

A82 Tarbet to Inverarnan

Project

Transport Scotland have commissioned Jacobs Fairhurst Joint Venture to look at options to upgrade the A82 between Tarbet and Inverarnan.

A82 Wellington Lay-by Allt Cumhang Wall

Project

This lay-by is a popular stopping point for tourist traffic, with a convenient location from which to view Loch Ness.

Page 2 of 9