7 Traffic Updates from A9 Tay Crossing to Ballinluig Filtered by Project: A9 Tay Crossing to Ballinluig

Keep up to date with planned traffic management and road works. Real time traffic information is available on the Traffic Scotland website. 

Filter by:

A9 Dualling: Tay Crossing to Ballinluig – overnight traffic signals on A9 north of Jubilee Bridge/Tay Crossing

31 Aug 2026

Works have been extended by two weeks to Tuesday 29 September.

A9 Dualling: Tay Crossing to Ballinluig project – temporary realignments to active travel routes

22 Jun 2026

Realignments to existing active travel routes will be introduced in the area in phases from week commencing 22 June

A9 Dualling: Tay Crossing to Ballinluig – reduced southbound lane width and overnight traffic management from 15 June

15 Jun 2026

Upcoming traffic management measures and changes to the road layout on the A9 between Ballinluig and south of Rotmell junction

A9 Dualling: Tay Crossing to Ballinluig - Overnight temporary traffic signals and changes to road layout on A9 at Guay

11 May 2026

In order to install the filter lane, overnight two-way temporary traffic signals and a lane closure will be required on the A9 overnight from 7pm until 6am the following day for a period of four weeks from Monday 11 May.

A9 Dualling: Tay Crossing to Ballinluig - Overnight traffic signals and widened lanes north of Jubilee Bridge/Tay Crossing

22 Apr 2026

There will be changes to temporary traffic management measures and the road layout on the A9 just north of the Jubilee Bridge/Tay Crossing as part of A9 Dualling works.

A9 Dualling: Tay Crossing to Ballinluig Project - Temporary traffic management measures and changes to road layout: Temporary roundabout and access arrangements at Kindallachan

10 Apr 2026

Overnight Temporary Traffic Signals on A9 between Tay Crossing and Ballinluig for Ground Investigation works

13 Jan 2025