FRC Studies and Reports (2008 - 2011)
This document library section features information on studies and reports published between 2008 and 2011.
Engaging with communities: Construction
Description: Document outlining how the public and stakeholders can get information and provide feedback on the Forth Replacement Crossing.
Publication Date: September 2011
FRC Final Local Area Paramics Modelling Audit Report
Description: A report presenting the findings of the Traffic and Transport Advisor and Auditor's (TTAA's) review of the development of the local area models used to assess the local traffic, economic, operational and environmental impacts of the FRC.
Publication Date: May 2011
South Queensferry Cutting Rev 2
Description: A technical report assessing potential groundwater effects resulting from the proposed South Queensferry cutting.
Publication Date: February 2011
South Queensferry Cutting Report
Description: Appendix A, B & C Drawings.
Publication Date: February 2011
Description: Public Transport Strategy prepared in support of the Forth Replacement Crossing.
Publication Date: July 2010
Queensferry Junction: Technical Assessment Summary Report
Description: A summary of the technical assessment work to inform and confirm the decision to reposition Queensferry Junction to the west of South Queensferry.
Publication Date: May 2010
Sustainability Appraisal & Carbon Management Report
Description: A report setting out defined objectives and sustainable design measures with the aim of delivering a more sustainable scheme.
Publication Date: November 2009
Description: A report presenting an appraisal of the possible health effects of the proposed scheme.
Publication Date: November 2009
Design Manual for Roads & Bridges Stage 3 Engineering Report
Description: Engineering description and assessment of the scheme.
Publication Date: November 2009
Consultation & Engagement Report
Description: A report documenting the consultation and engagement activities which were undertaken during the development of the scheme.
Publication Date: November 2009
Public Information Exhibitions - Feedback and Outcomes Report - Appendix to the June 2009 Report
Description: This Appendix to the June 2009 report provides responses to the issues raised which were not covered by the responses to the common or repeated points of feedback in the June 2009 report.
Publication Date: November 2009
Update August 2009 high-definition version (6.94 MB)
Description: August 2009 edition of the Forth Replacement Crossing newsletter.
Publication Date: August 2009
Description: This guide provides information and advice about the statutory procedures that the Scottish Ministers and Transport Scotland propose to follow for the compulsory purchase process.
Publication Date: July 2009
Public information exhibitions - feedback and outcomes report
Description: This report documents the feedback received at public exhibition events held in January 2009, explains how this has been, or is being, taken into account and describes the outcomes of the consultation.
Publication Date: June 2009
Update April 2009 high-definition version (4.41 MB)
Description: April 2009 edition of Forth Replacement Crossing newsletter.
Publication Date: April 2009
Update January 2009 high definition version (5 MB)
Description: January 2009 edition of Forth Replacement Crossing newsletter.
Publication Date: January 2009
Sustainable Development Policy
Description: The Forth Replacement Crossing’s Sustainable Development policy has been developed to harmonise with five key principles that underpin Scotland’s National sustainable development policy.
Publication Date: January 2009
Description: December 2008 edition of Forth Replacement Crossing newsletter.
Publication Date: December 2008
Description: Document outlining how the public and stakeholders can get information and provide feedback on the Forth Replacement Crossing.
Publication Date: September 2008
Update September 2008 high-definition version (1.22 MB)
Description: September 2008 edition of Forth Replacement Crossing newsletter.
Publication Date: September 2008
Update July 2008 high-definition version (770 kb)
Description: July 2008 edition of Forth Replacement Crossing newsletter.
Publication Date: July 2008
Update April 2008 high-definition version (571 kb)
Description: April 2008 edition of Forth Replacement Crossing newsletter.
Publication Date: April 2008
Description: An information leaflet listing key milestones that have been achieved on the project since the announcement in December 2007 that the Forth Replacement Crossing will be a multi-modal cable stayed bridge.
Publication Date: April 2008
Environmental surveys and ground investigations
Description: An information leaflet for landowners.
Publication Date: March 2008
Environmental surveys and ground investigations-information for landowners
Description: Information leaflet about environmental surveys and ground investigations for the Forth Replacement Crossing.
Publication Date: March 2008