DMRB Stage 3 Assessment Report - Forth Replacement Crossing

Design manual for roads and bridges stage 3 engineering report, the Forth Replacement Crossing.

Contents

Stage 3 Report

Appendix A - The Scheme

  • Figure 1.1 : The Managed Crossing Scheme
  • Figure 2.1 : Existing Road Network – Northern Study Area
  • Figure 2.2 : Existing Road Network – Southern Study Area
  • Figure 2.3 : Base 2005 AADT & % HGV data
  • Figure 2.4 : 2005 Base Traffic Destinations Southbound
  • Figure 3.1 : Typical Cross Sections – Mainline Carriageway
  • Figure 3.2 : Typical Cross Sections – Side Roads
  • Figure 3.3 : Indicative Main Crossing Details
  • Figure 3.4 : Forth Road Bridge – Public Transport Crossing Configurations
  • Figure 3.5 : M9 Junction 1a – Plan and Long section – Sheet 1 of 3
  • Figure 3.6 : M9 Junction 1a – Plan and Long section – Sheet 2 of 3
  • Figure 3.7 : M9 Junction 1a – Plan and Long section – Sheet 3 of 3
  • Figure 3.8 : Queensferry – Plan and Long section – Sheet 1 of 4
  • Figure 3.9 : Queensferry – Plan and Long section – Sheet 2 of 4
  • Figure 3.10 : Queensferry – Plan and Long section – Sheet 3 of 4
  • Figure 3.11 : Queensferry – Plan and Long section – Sheet 4 of 4
  • Figure 3.12 : North of the Firth of Forth – Plan and Long section – Sheet 1 of 4
  • Figure 3.13 : North of the Firth of Forth – Plan and Long section – Sheet 2 of 4
  • Figure 3.14 : North of the Firth of Forth – Plan and Long section – Sheet 3 of 4
  • Figure 3.15 : North of the Firth of Forth – Plan and Long section – Sheet 4 of 4
  • Figure 3.16 : North of the Firth of Forth – Pedestrian and Cyclist Facilities
  • Figure 3.17 : South of the Firth of Forth – Pedestrian and Cyclist Facilities

Appendix B - Cost Estimate

Appendix - C - Engineering Assessment

  • Figure 4.1 : North of the Firth of Forth  – Earthworks Reference Plan – Sheet 1 of 2
  • Figure 4.2 : North of the Firth of Forth – Earthworks Reference Plan – Sheet 2 of 2
  • Figure 4.3 : South of the Firth of Forth – Earthworks Reference Plan
  • Figure 4.4 : North of the Firth of Forth – Structures Location Plan
  • Figure 4.5 : South of the Firth of Forth – Structures Location Plan

Appendix D - Traffic Assessment

  • Figure 5.1 : 2005 – 2017 Population data
  • Figure 5.2 : 2005 – 2017 Households data
  • Figure 5.3 : 2005 – 2017 Employment data
  • Figure 5.4 : 2017 – 2027 Population data
  • Figure 5.5 : 2017 -2027 Households data
  • Figure 5.6 : 2017 – 2027 Employment data
  • Figure 5.7 : Annual Average Daily Traffic Levels & % HGV, Do-Min Year 2017
  • Figure 5.8 : Annual Average Daily Traffic Levels & % HGV, Do-Min Year 2032
  • Figure 5.9 : Annual Average Daily Traffic Levels & % HGV, Restricted Do-Min Year 2017
  • Figure 5.10 : Extent of Paramics Model Network
  • Figure 6.1 : Annual Average Daily Traffic Levels & % HGV, Managed Crossing Year 2017
  • Figure 6.2 : Annual Average Daily Traffic Levels & % HGV, Managed Crossing Year 2032

Published Date 16 Nov 2009 Type Projects Mode of transport