Skip to main content
This site uses cookies to store information on your computer. Some of these cookies are essential to make our site work and others help us to improve by giving us some insight into how the site is being used.
Transport Scotland, Comhdhail alba home button
  • About
  • News
  • Consultations
  • Media Library
  • Publications
  • Traffic management updates
  • About
  • News
  • Our approach
  • Public transport
  • Walking, wheeling and cycling
  • Transport network
  • Projects
  • Concessionary travel
  • Consultations
  • Media Library
  • Publications
  • Traffic management updates
  • Home
  • Publications

DMRB Stage 3 Scheme Assessment Report

Design Manual for Roads and Bridges (DMRB) Stage 3 Assessment for the A9/A96 Inshes to Smithton scheme.


Scheme Assessment Report

  • View A9A96 Inshes To Smihton DMRB Stage 3 Scheme Assessment Report

Figures

  • View Figure 1.1 Existing Conditions
  • View Figure 1.2 Proposed Scheme
  • View Figure 1.3 Proposed Structures
  • View Figure 2.1 NMU Proposals
  • View Figure 3.1A Local Road Plan And Profile
  • View Figure 3.1B Local Road Plan And Profile
  • View Figure 3.1C Local Road Plan And Profile
  • View Figure 3.1D Local Road Plan And Profile
  • View Figure 3.2 PS02 Inshes Overbridge Plan And Profile
  • View Figure 3.3 A9 Lane Gain Lane Drop Plan And Profile
  • View Figure 3.4A Proposed Scheme Road Cross Sections
  • View Figure 3.4B Proposed Scheme Road Cross Sections
  • View Figure 4.1 Departures Location Plan
  • View Figure 4.2 Drainage Overview
  • View Figure 5.1A MFTM Network
  • View Figure 5.1B MFTM Network
  • View Figure 5.2 Temporary ATC And JTC Locations And RSI Sites
  • View Figure 5.3 Transport Scotland ATC Counters
  • View Figure 5.4 MFTM Journey Time Routes
  • View Figure 5.5 Accidents 2012 To 2016
  • View Figure 5.6 Moray Firth Transport Model Base Aadts 2018
  • View Figure 5.7 Operational Model Cordon Network
  • View Figure 5.8A Moray Firth Transport Model Aadts 2037
  • View Figure 5.8B Moray Firth Transport Model Aadts 2037
  • View Figure 5.9 Operational Model Journey Times

Back to top


Published Date 25 Sep 2019 Type
  • Report
Projects
  • A9/A96 Inshes to Smithton
Mode of transport
  • Road
  • Contact
  • Freedom Of Information
  • Careers
© Copyright Transport Scotland
  • Accessibility
  • Website privacy policy
  • Cookie Policy
  • Terms & Conditions