DMRB Stage 3 Scheme Assessment Report
Design Manual for Roads and Bridges (DMRB) Stage 3 Assessment for the A9/A96 Inshes to Smithton scheme.
Scheme Assessment Report
Figures
- View Figure 1.1 Existing Conditions
- View Figure 1.2 Proposed Scheme
- View Figure 1.3 Proposed Structures
- View Figure 2.1 NMU Proposals
- View Figure 3.1A Local Road Plan And Profile
- View Figure 3.1B Local Road Plan And Profile
- View Figure 3.1C Local Road Plan And Profile
- View Figure 3.1D Local Road Plan And Profile
- View Figure 3.2 PS02 Inshes Overbridge Plan And Profile
- View Figure 3.3 A9 Lane Gain Lane Drop Plan And Profile
- View Figure 3.4A Proposed Scheme Road Cross Sections
- View Figure 3.4B Proposed Scheme Road Cross Sections
- View Figure 4.1 Departures Location Plan
- View Figure 4.2 Drainage Overview
- View Figure 5.1A MFTM Network
- View Figure 5.1B MFTM Network
- View Figure 5.2 Temporary ATC And JTC Locations And RSI Sites
- View Figure 5.3 Transport Scotland ATC Counters
- View Figure 5.4 MFTM Journey Time Routes
- View Figure 5.5 Accidents 2012 To 2016
- View Figure 5.6 Moray Firth Transport Model Base Aadts 2018
- View Figure 5.7 Operational Model Cordon Network
- View Figure 5.8A Moray Firth Transport Model Aadts 2037
- View Figure 5.8B Moray Firth Transport Model Aadts 2037
- View Figure 5.9 Operational Model Journey Times