A19.2 Construction Noise Results

A19.2 Construction Noise Results

This section is also available in pdf format (108k)

1 Main Crossing

1.1.1 The construction noise assessment for the Main Crossing was undertaken based upon the construction assumptions presented in Appendix A4.1, for those receptors identified on Figure 16.1. The results are presented in Tables 1.1 to 1.4 and on Figures 19.2 to 19.3.

1.1.2 The methodologies for defining the Assessment Levels and calculating forecast noise levels are presented in Section 19.6 of Chapter 19 (Disruption Due to Construction). The ambient noise levels have been evaluated from the measurements reported in Appendix A16.2.  Ambient levels are rounded to the nearest 5dB and the criteria provided in Table 19.10 of Chapter 19 (Disruption due to Construction) have been applied to provide the assessment level.  The predicted noise impacts are represented as the highest monthly average noise level during the construction period and also the number of months where construction noise exceeds the assessment level.

Table 1.1: Predicted Daytime Noise Levels

Receptor Name

Ambient Noise Level LAeq,12hr [dB]

Ambient to nearest 5 dB

Assessment level (AL) LAeq,12hr [dB]

No. of months predicted levels exceed AL

Highest monthly average LAeq,12hr [dB]**

Admiralty House

60

60

65

4

67

Queensferry Hotel

60

60

65

0

62

Tigh-na-grian

60

60

65

0

58

Craigdhu Cottage

60

60

65

0

33

19 Ferry Road

60

60

65

0

37

Butlaw Cottages

51

50

65

0

48

Inchgarvie House

51

50

65

3

72

89 Society Road

53

55

65

0

47

Inchgarvie Lodge /
Clufflat Brae

53

55

65

0

63

4 Rose Lane

59

60

65

0

34

40 Shore Road

59

60

65

0

35

58 High Street

59

60

65

0

37

17 Ferry Barns Court

60

60

65

0

36

St Margaret’s Hope Lodge

60

60

65

1

65

Butlaw Fisheries

51

50

65

0

56

** Note: proposed scheme construction noise only. Highest daily noise levels may typically exceed the average month levels by 5 dB(A).

Table 1.2: Predicted Evening Noise Levels

Receptor Name

Typical Ambient Noise Level LAeq,1hr [dB]

Ambient to nearest 5 dB

Assessment level (AL) LAeq,1hr [dB]

No. of months predicted levels exceed AL

Highest monthly average LAeq,1hr [dB]**

Admiralty House

60

60

65

0

57

Queensferry Hotel

60

60

65

0

54

Tigh-na-grian

60

60

65

0

55

Craigdhu Cottage

60

60

65

0

32

19 Ferry Road

60

60

65

0

33

Butlaw Cottages

47

45

55

0

43

Inchgarvie House

47

45

55

0

45

89 Society Road

49

50

55

0

43

Inchgarvie Lodge /
Cluffllat Brae

49

50

55

0

47

4 Rose Lane

58

60

65

0

32

40 Shore Road

58

60

65

0

32

58 High Street

58

60

65

0

35

17 Ferry Barns Court

60

60

65

0

26

St Margaret’s Hope Lodge

60

60

65

0

40

Butlaw Fisheries

47

45

55

0

51

** Note: proposed scheme construction noise only. Highest daily noise levels may typically exceed the average month levels by 5 dB(A).

Table 1.3: Predicted Night-time Noise Levels

Receptor Name

Typical Ambient Noise Level LAeq,1hr [dB]

Ambient to nearest 5 dB

Assessment level (AL) LAeq,1hr [dB]

No. of months predicted levels exceed AL

Highest monthly average LAeq,12hr [dB]**

Admiralty House

57

55

55

0

53

Queensferry Hotel

57

55

55

0

53

Tigh-na-grian

57

55

55

5

56

Craigdhu Cottage

57

55

55

0

19

19 Ferry Road

57

55

55

0

33

Butlaw Cottages

44

45

50

0

42

Inchgarvie House /
Clufflat Brae

44

45

50

0

43

89 Society Road

46

45

50

0

42

Inchgarvie Lodge

46

45

50

0

44

4 Rose Lane

54

55

55

0

28

40 Shore Road

54

55

55

0

31

58 High Street

54

55

55

0

31

17 Ferry Barns Court

57

55

55

0

26

St Margaret’s Hope Lodge

57

55

55

0

39

Butlaw Fisheries

44

45

50

0

49

** Note: proposed scheme construction noise only. Highest daily noise levels may typically exceed the average month levels by 5 dB(A).

1.1.3 Table 1.4 summarises the forecast noise impacts arising from the main crossing construction works.

Table 1.4: Summary of Predicted Noise Impacts (Main Crossing)

Location

Number of receptors

Day

Evening

Night

Duration

Admiralty House

1

√

   

4 months

Tigh-na-grian

2

   

√

5 months

Inchgarvie House

1 (10 flats)

√

   

3 months

St Margaret’s Hope Lodge

1

√

   

1 month

2 Network Connections

2.11. The construction noise assessment for the network connections was undertaken based upon the construction assumptions presented in Appendix A4.1, for those receptors identified in Figure 16.1. The results are presented Tables 2.1 to 2.2 and on Figures 19.2 to 19.3.

2.1.2 The methodologies for defining the Assessment Levels and calculating forecast noise levels are presented in Section 19.6 of Chapter 19 (Disruption Due to Construction). The ambient noise levels have been evaluated from the measurements reported in Appendix A16.2. Ambient levels are rounded to the nearest 5dB and the criteria provided in Table 19.10 of Chapter 19 (Disruption due to Construction) have been applied to provide the assessment level.  The predicted noise impacts are represented as the highest monthly average noise level during the construction period and also the number of months where construction noise exceeds the assessment level.

Table 2.1: Predicted Daytime Noise Impacts

Receptor Address

Ambient Noise Level LAeq,12hr [dB]

Ambient to nearest 5 dB

Assessment level (AL) [dB]

No. of months predicted levels exceed AL

Highest monthly average LAeq,12hr [dB]**

39 Cotlaws

72

70

75

0

69

95 King Edwards Way

72

70

75

0

72

55 King Edwards Way

72

70

75

0

62

85 Maitland Hog Lane

72

70

75

0

56

38 King Edwards Way

72

70

75

0

53

26 Cotlaws

72

70

75

0

54

15 - 17 Buie Rigg

67

65

70

0

67

26 Buie Rigg

67

65

70

0

64

8 Buie Rigg

67

65

70

0

59

43 Buie Brae

67

65

70

0

56

34 Buie Rigg

67

65

70

0

52

Kirkliston Sports Centre

67

65

70

0

58

Kirkliston Sports Centre

67

65

70

0

58

1 Glendinning Road

67

65

70

0

56

11 Glendinning Road

67

65

70

0

55

8 Kirklands Park Grove

67

65

70

0

63

11 Kirklands Park Grove

67

65

70

0

63

15 Provost Milne Grove

55

55

65

0

45

16 The Glebe

55

55

65

0

40

45 Scotstoun Park

55

55

65

0

50

124 & 125 South Scotstoun

55

55

65

0

51

103 Provost Milne Grove

55

55

65

0

52

73 Provost Milne Grove

55

55

65

0

51

54 Provost Milne Grove

55

55

65

0

45

63 South Scotstoun

55

55

65

0

48

Scotstoun Cottage

55

55

65

0

56

46 Scotstoun Park

55

55

65

0

58

68 South Scotstoun

55

55

65

0

56

66 Echline Drive

55

55

65

0

56

3 - 4 Echline

55

55

65

0

51

9 Echline

55

55

65

0

51

21 Echline

55

55

65

0

47

104 Echline Drive

55

55

65

0

52

120 Echline Drive

55

55

65

0

50

48 Echline Drive

55

55

65

0

51

17 Springfield Terrace

55

55

65

0

51

17 Springfield Place

55

55

65

0

55

60 Springfield Crescent

55

55

65

0

47

25 Springfield Lea

53

55

65

0

57

22 Clufflat Brae

53

55

65

0

54

4 Clufflat Brae

53

55

65

0

58

Inchgarvie Lodge

53

55

65

0

63

Inchgarvie House

51

50

65

3

72

13 Linnmill

51

50

65

0

64

26 Linnmill

51

50

65

0

48

6 Linnmill

51

50

65

0

55

Port Edgar (free field)

56

55

65

0

43

Admiralty House

60

60

65

0

59

Queensferry Hotel E

60

60

65

0

51

Queensferry Hotel N

60

60

65

0

59

St Margaret’s Hope Lodge

60

60

65

1

65

N Queensferry Community

60

60

65

0

46

2 Shamrock Terrace

61

60

65

0

59

33 Ferryhills Road

61

60

65

0

58

East Scotland Contracts

61

60

65

0

58

84 Hope Street

61

60

65

0

46

22 Whinnyhill Crescent

61

60

65

0

50

42 Whinnyhill Crescent

61

60

65

0

49

16 Whinnyhill Crescent

61

60

65

0

50

2 Glebe Terrace

61

60

65

0

44

Newbigging Lodge

55

55

65

0

53

3 Dundas Home Farm

55

55

65

0

49

** Note: proposed scheme construction noise only. Highest daily noise levels may typically exceed the average month levels by 5 dB(A).

2.1.3 Table 2.2 summarises the forecast noise impacts arising from the network connection construction works.

Table 2.2: Summary of Predicted Noise Impacts (network connections)

Location

Number of receptors

Day

Evening

Night

Duration

Inchgarvie House

3

√

   

3 months

St Margaret’s Hope Lodge

1

√

   

1 month