Preliminary Engineering Services - DMRB Stage 1 Assessment - A83 Access to Argyll and Bute
The Design Manual for Roads and Bridges (DMRB) Stage 1 Assessment Report follows on from the Preliminary Assessment and describes the more detailed assessment of the preferred route corridor. The report provides:
- A description of the existing conditions within the preferred route corridor, and for specific criteria the wider A83 Trunk Road
- A description of the five possible route options identified within the preferred route corridor
- An engineering assessment, of the five possible route options within the preferred route corridor
- A summary of findings of the Strategic Environmental Assessment (SEA)
- A traffic and economics assessment of the five possible route options within the preferred route corridor
- A description of risks present
Appendices
- View DMRB Stage 1 Report Appendix A Figure 1 A83 Access To Argyll And Bute
- View DMRB Stage 1 Report Appendix A Figure 3 To Figure 5 A83 Access To Argyll And Bute
- View DMRB Stage 1 Report Appendix A Figure 6 A83 Access To Argyll And Bute
- View DMRB Stage 1 Report Appendix A Figure 7 To Figure 8 A83 Access To Argyll And Bute
- View DMRB Stage 1 Report Appendix A Figure 9 A83 Access To Argyll And Bute
- View DMRB Stage 1 Report Appendix B Drawings A83 Access To Argyll And Bute
Published Date
29 Apr 2021
Type
Projects
Mode of transport