Scottish Trunk Road Infrastructure Project Evaluation - Evaluation Report for Trunk Road Projects Opened between April 09 and March 10
ISBN 978 1 909948 10 5
This document is also available in pdf format (1.7MB)
CONTENTS
1 Introduction
1.1 Background to Project Evaluation
1.2 Projects Reported
2 Methodology and Data Sources
2.1 Overview
2.2 Network Traffic Indicators
2.3 Environmental
2.4 Safety
2.5 Economy
2.6 Integration
2.7 Accessibility & Social Inclusion
2.8 Costs to Government
2.9 Value for Money
2.10 Achievement of Objectives
3 Evaluation Summary
3.1 Network Traffic
3.2 Environment
3.3 Safety
3.4 Economy
3.5 Integration
3.6 Accessibility & Social Inclusion
3.7 Cost to Government
3.8 Value for Money
3.9 Achievement of Objectives
4 Key Findings
4.1 Introduction
4.2 Network Traffic
4.3 Environment
4.4 Safety
4.5 Economy
4.6 Integration
4.7 Accessibility & Social Inclusion
4.8 Cost to Government
4.9 Value for Money
4.10 Achievement of Objectives
Appendix A: Evaluations For Projects That Opened Between
April 09and March 10
A.1 A830(T) Arisaig to loch nan uamh
A.2 A7(T) Auchenrivock
A.3 A9(T) Bankfoot
TABLES
Table 1.1 Projects Opened Between April 09 and March 10
Table 3.1: All Projects - ATC Data
Table 3.2: All Projects - Traffic Analysis Summary
Table 3.3: All Projects - Assessment of Carriageway Standard (TA 46/97)
Table 3.4: All Projects - Personal Injury Accident Data Summary
Table 3.5: All Projects - Qualitative Evaluation of Benefits
Table 3.6: All Projects - Project Cost Summary
Table 3.7: All Projects - Value for Money Summary
Table 3.8: All Projects - Progress Towards Achieving Objectives
Table A.1.1: A830(T) Arisaig to Loch Nan Uamh - ATC Data
Table A.1.2: A830(T) Arisaig to Loch Nan Uamh - Traffic Analysis Summary
Table A.1.3: A830(T) Arisaig to Loch Nan Uamh - Assessment of Carriageway Standard (TA 46/97)
Table A.1.4: A830(T) Arisaig to Loch Nan Uamh - Travel Time Data
Table A.1.5: A830(T) Arisaig to Loch Nan Uamh - Accident Data Summary
Table A.1.6: A830(T) Arisaig to Loch Nan Uamh - Project Cost Summary
Table A.1.7: A830(T) Arisaig to Loch Nan Uamh - Progress Towards Achieving Objectives
Table A.2.1: A7(T) Auchenrivock - ATC Data
Table A.2.2: A7(T) Auchenrivock - Traffic Analysis Summary
Table A.2.3: A7(T) Auchenrivock - Assessment of Carriageway Standard (TA 46/97)
Table A.2.4: A7(T) Auchenrivock - Accident Data Summary
Table A.2.5: A7(T) Auchenrivock - Project Cost Summary
Table A.2.6: A7(T) Auchenrivock - Progress Towards Achieving Objectives
Table A.3.1: A9(T) Bankfoot - ATC Data
Table A.3.2: A9(T) Bankfoot - Traffic Analysis Summary
Table A.3.3: A9(T) Bankfoot - Accident Data Summary
Table A.3.4: A9(T) Bankfoot - Project Cost Summary
Table A.3.5: A9(T) Bankfoot - Progress Towards Achieving Objectives
FIGURES
Figure 1.1: Locations of Projects Evaluated
Figure A.1a: A830(T) Arisaig to Loch Nan Uamh - General Location Plan
Figure A.1b: A830(T) Arisaig to Loch Nan Uamh - 3 Years Before Opening Accidents
Figure A.1c: A830(T) Arisaig to Loch Nan Uamh - 1 Year After Opening Accidents
Figure A.2a: A7(T) Auchenrivock - General Location Plan
Figure A.2b: A7(T) Auchenrivock - 3 Years Before Opening Accidents
Figure A.2c: A7(T) Auchenrivock - 1 Year After Opening Accidents
Figure A.3a: A9(T) Bankfoot - General Location Plan
Figure A.3b: A9(T) Bankfoot - 3 Years Before Opening Accidents
Figure A.3c: A9(T) Bankfoot - 1 Year After Opening Accidents
Further copies of this document are available, on request, in audio and large print formats and in community languages (Urdu; Bengali; Gaelic; Hindi; Punjabi; Cantonese; Arabic; Polish).