Transport Scotland Scottish Trunk Road Infrastructure Project Evaluation - 1YA Evaluation Report for A77(T) Park End to Bennane
ISBN 978 1 909948 38 9
This document is also available in pdf format (1.7MB)
Contents
1 Summary of impacts
1.1 Operational Indicators - How is the scheme operating?
1.2 Process Indicators - How well was the scheme implemented?
1.3 Objectives - Is the scheme on track to meet its objectives?
1.4 Costs to Government - Is the scheme delivering value for money?
2 Introduction
2.1 Background to Project Evaluation
2.2 Evaluation Reporting
3 A77(T) Park End to Bennane
3.1 Introduction
3.2 Evaluation Methodology
3.3 The operation of the scheme and process evaluation
3.4 Environment
3.5 Safety
3.6 Economy
3.7 Cost to Government
3.8 Value for Money
3.9 Progress Towards Achieving Objectives
A Methodology and Data Sources
A.1 Overview
A.2 Network Traffic Indicators
A.3 Environmental
A.4 Safety
A.5 Economy
A.6 Integration
A.7 Accessibility & Social Inclusion
A.8 Costs to Government
A.9 Value for Money
A.10 Achievement of Objectives
TABLES
Table 2.1 Summary details - A77(T) Park End to Bennane
Table 3.1: A77(T) Park End to Bennane - ATC Data
Table 3.2: A77(T) Park End to Bennane - Traffic Analysis Summary
Table 3.3: A77(T) Park End to Bennane - Level of Overtaking
Table 3.4a: A77(T) Park End to Bennane - Number of Platoons (AM Survey Period)
Table 3.4b: A77(T) Park End to Bennane - Number of Platoons (PM Survey Period)
Table 3.5: A77(T) Park End to Bennane - Assessment of Mean Vehicle Speeds (mph)
Table 3.6: A77(T) Park End to Bennane - Accident Data Summary
Table 3.7: A77(T) Park End to Bennane - Project Cost Summary
Table 3.8: A77(T) Park End to Bennane - Progress Towards Achieving Objectives
FIGURES
Figure 2.1: Locations of Projects Evaluated
Figure 3.1: A77(T) Park End to Bennane - General Location Plan
Figure 3.2a: A77(T) Park End to Bennane - 3 Years Before Opening Accidents
Figure 3.2b: A77(T) Park End to Bennane - 1 Year After Opening Accidents