16 Publications from A9 Pass of Birnam to Tay Crossing

Filter by:

EQIA and Fairer Scotland Duty Assessment - DMRB Stage 3 - Pass of Birnam to Tay Crossing - A9 Dualling

17 Jun 2025

This report presents the findings of a combined Equality Impact Assessment (EqIA) and Fairer Scotland Duty Assessment (FSDA) of the proposed dualling of the A9 between the Pass of Birnam and Tay Crossing.

Natural Capital Assessment - DMRB Stage 3 - Pass of Birnam to Tay Crossing - A9 Dualling

17 Jun 2025

This report comprises the Design Manual for Roads and Bridges (DMRB) Stage 3 Natural Capital Assessment (NCA) for the A9 Dualling Programme: Pass of Birnam to Tay Crossing project.

Draft Orders - Pass of Birnam to Tay Crossing - A9 Dualling

30 May 2025

Draft Orders, including the draft Compulsory Purchase Order, for the A9 Dualling Pass of Birnam to Tay Crossing project - the statutory consultation period closes on 25 July 2025

Environmental Impact Assessment Report - Pass of Birnam to Tay Crossing - A9 Dualling

30 May 2025

An Environmental Impact Assessment (EIA) for the proposed scheme is required under European and Scottish Legislation. The EIA Report details the findings of the EIA, which has been undertaken in line with the Design Manual for Roads and Bridges (DMRB).

Exhibition Materials - Draft Order Exhibitions - Pass of Birnam to Tay Crossing - A9 Dualling - June 2025

30 May 2025

Public Exhibitions are being held for the A9 Dualling Pass of Birnam to Tay Crossing project, to present the draft Orders, including the Compulsory Purchase Order (CPO), and Environmental Impact Assessment Report (EIAR) for the proposed scheme, which were published on 30 May 2025.

Consultation Report - August 2024 Community Engagement Events - Pass of Birnam to Tay Crossing - A9 Dualling

7 Feb 2025

This Consultation Report provides details of the consultation process and summarises key findings and feedback received from the public.

A9 Dualling - Pass of Birnam to Tay Crossing - Design Manual for Roads and Bridges (DMRB) Stage 2 Scheme Assessment Report

24 Sep 2024

This is the summary report for the A9 Dualling - Pass of Birnam to Tay Crossing - DMRB Stage 2 Scheme Assessment Report.

Exhibition materials - Community engagement events - August 2024 - Pass of Birnam to Tay Crossing - A9 Dualling

20 Aug 2024

Consultation Report - Preferred Route Exhibition - Pass of Birnam to Tay Crossing - A9 Dualling

20 Aug 2024

Exhibition materials - Preferred route exhibition - Pass of Birnam to Tay Crossing - A9 Dualling

20 Dec 2023

Materials presented at the preferred route exhibitions for the A9 Dualling Pass of Birnam to Tay Crossing project.