A9 Dualling - Pass of Birnam to Tay Crossing - Design Manual for Roads and Bridges (DMRB) Stage 2 Scheme Assessment Report

24 Sep 2024

This is the summary report for the A9 Dualling - Pass of Birnam to Tay Crossing - DMRB Stage 2 Scheme Assessment Report.

Consultation Report - August 2024 Community Engagement Events - Pass of Birnam to Tay Crossing - A9 Dualling

7 Feb 2025

This Consultation Report provides details of the consultation process and summarises key findings and feedback received from the public.

Environmental Impact Assessment Report - Non-Technical Summary - Pass of Birnam to Tay Crossing - A9 Dualling

30 May 2025

This document is the Non-Technical Summary (NTS) of the Environmental Impact Assessment Report (EIAR) for the A9 Dualling: Pass of Birnam to Tay Crossing.

Exhibition Materials - Draft Order Exhibitions - Pass of Birnam to Tay Crossing - A9 Dualling - June 2025

30 May 2025

Public Exhibitions are being held for the A9 Dualling Pass of Birnam to Tay Crossing project, to present the draft Orders, including the Compulsory Purchase Order (CPO), and Environmental Impact Assessment Report (EIAR) for the proposed scheme, which were published on 30 May 2025.

Natural Capital Assessment - DMRB Stage 3 - Pass of Birnam to Tay Crossing - A9 Dualling

17 Jun 2025

This report comprises the Design Manual for Roads and Bridges (DMRB) Stage 3 Natural Capital Assessment (NCA) for the A9 Dualling Programme: Pass of Birnam to Tay Crossing project.

EQIA and Fairer Scotland Duty Assessment - DMRB Stage 3 - Pass of Birnam to Tay Crossing - A9 Dualling

17 Jun 2025

This report presents the findings of a combined Equality Impact Assessment (EqIA) and Fairer Scotland Duty Assessment (FSDA) of the proposed dualling of the A9 between the Pass of Birnam and Tay Crossing.

Payments to rail franchises under the Emergency Measures Agreements - September 2020 to March 2021

10 Dec 2021

A summary of all payments made to rail operators during this period.

Baseline Data Collection and Analysis - Technical Appendices - Evaluation of the Levenmouth Rail Link Reopening

18 Dec 2024

This document contains the technical appendices for the Levenmouth Rail Link Baseline Evaluation Report.

M8 J26 Hillington IC East, West, Rail and Slip Refurbishment Phase 1 - Environmental Record of Determination

4 Sep 2025

Determination of the need for an Environmental Impact Assessment, as required by the 2017 amendment (Environmental Impact Assessment Regulations) to The Roads (Scotland) Act 1984.

Rail Recharged: Scotland’s Fleet Transition Strategy - Delivering a Modern Fleet for a Connected Scotland

21 Nov 2025

Our bold strategy to replace ScotRail trains reaching the end of their useable-life