10000 results
Filter by:
A9 Tomatin to Moy
Article
A9 Helmsdale to Ord of Caithness Improvements Phase 2
ProjectThis project involves the construction of 2.1 kilometres of 6 metre-wide single carriageway, with 1 metre hard strips and a minimum soft verge width of 1.65 metres. At the northern end of the scheme, a 280 metre-long 10 metre-wide climbing lane has been provided.
A9 Helmsdale to Ord of Caithness improvements phase 2
Article
Media Results
A9 Kessock Bridge Resurfacing
ProjectThe Kessock Bridge opened to traffic in 1982. It is a cable stayed bridge and carries the A9 dual carriageway trunk road across the Beauly Firth at Inverness.
A9 Kessock Bridge resurfacing
Article
A9 Moy 2+1 Improvements and Maintenance
ProjectThis project is now complete. It involved the construction of a new 1.06km northbound overtaking lane, with associated drainage, surfacing and safety fencing improvements.
A9 Moy 2+1 improvements and maintenance
Article
A9 Portgower Mill Bridge Replacement
ProjectContractors replaced the old twin pipe culvert structure with a new single span bridge, designed to modern standards. The works included localised road widening.
A9 Portgower Mill Bridge replacement
Article
A9/A82 Longman Junction Improvement Scheme
ProjectA new grade-separated junction at Longman, as part of the Scottish Government commitments in the Inverness and Highland City-Region Deal