10000 results

Project case study - Project awards

Article

A9 Pass of Birnam to Tay Crossing

Project

​The Pass of Birnam to Tay Crossing section will give a 10.2km continuous dual carriageway, incorporating the existing dual carriageway at Pass of Birnam

Project details

Article

This 10.2 km road from Pass of Burnham to Tay Crossing is being upgraded to dual carriageway as part of a wider project to improve the A9 between Perth and Inverness.

Media Results

A9 Tay Crossing to Ballinluig

Project

​The 8.4km road from Tay Crossing to Ballinluig is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

Project details

Article

The A9 between Tay Crossing and Ballinluig is being upgraded to a dual carriageway as part of a wider project along the A9 between Perth and Inverness.

A9 Pitlochry to Killiecrankie

Project

Transport Scotland are currently upgrading the A9 between Perth and Inverness from single to dual carriageway - as part of that, the 5.7km stretch from Pitlochry to Killicrankie will be developed by Jacobs Engineering on behalf of Transport Scotland

Project details

Article

Transport Scotland are currently upgrading the A9 between Perth and Inverness from single to dual carriageway. As part of that, the 5.7km stretch from Pitlochry to Killicrankie will be developed by Jacobs Engineering on behalf of Transport Scotland.

A9 Killiecrankie to Glen Garry

Project

This 22 km road from Killiecrankie to Glen Garry is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

Project details

Article

A9 Glen Garry to Dalwhinnie

Project

This 12.2km stretch between Glen Garry and Dalwhinnie is being upgraded to dual carriageway as part of a wider programme to improve the A9 between Perth and Inverness

Page 494 of 1000