Medium term strategy - Options assessment report - January 2023 - A83 Access to Argyll and Bute
This report sets out the option development and assessment process for a medium-term solution (MTS) to improve the resilience of the diversion route when the A83 Trunk Road is closed due to landslides, flooding, or other incidents, prior to a long-term solution (LTS) being introduced.
Main report in PDF format
Appendix A - Single lane forestry track upgrade option drawings
Appendix B - OMR interventions drawings and schedule
Appendix C - Offline MTS option drawings
Appendix D - Options assessment summary tables
- View Option 1 Single Lane Forestry Track Assessment Summary Table Medium Term Solution A83 Access To Argyll And Bute
- View Option 2 Two Lane Offline Road Assessment Summary Table Medium Term Solution A83 Access To Argyll And Bute
- View Option 3 OMR Improvements Assessment Summary Table Medium Term Solution A83 Access To Argyll And Bute
Appendix E - Fact sheets
- View 01 Option Fact Sheet OMR Interventions
- View 02 Option Fact Sheet Single Lane Forestry Track Upgrade
- View 03 Option Fact Sheet Offline 2 Way Road Reduced Cross Section
- View 04 Option Fact Sheet Offline 2 Way Road Wider Cross Section
- View 05 Option Fact Sheet Long Term Scheme With Debris Flow Shelter
- View 06 Option Fact Sheet Long Term Scheme With Debris Flow Shelter And Short Viaduct
- View 07 Option Fact Sheet Long Term Scheme With Viaduct
- View 08 Option Fact Sheet Convert Reduced Cross Section Offline 2 Way Road Option To LTS DFS Option
- View 09 Option Fact Sheet Convert Wider Cross Section Offline 2 Way Road Option To LTS DFS Option
- View 10 Option Fact Sheet Phased Approach DFS
- View 11 Option Fact Sheet Phased Approach DFS And Short Viaduct