30 Publications from Forth Replacement Crossing
Filter by:
DMRB Stage 3 Assessment Report - Forth Replacement Crossing
16 Nov 2009Design manual for roads and bridges Stage 3 engineering report for the Forth Replacement Crossing
Forth Replacement Crossing Health Impact Assessment
12 Nov 2009A report presenting an appraisal of the possible health effects of the proposed scheme
Forth Replacement Crossing: Guidance on the Parliamentary Process, Compulsory Purchase Process and Compensation
16 Jul 2009Information and advice about the statutory procedures that the Scottish Ministers and Transport Scotland propose to follow for the compulsory purchase process for the Forth Replacement Crossing project
Forth Replacement Crossing: DMRB Stage 2 Corridor Report: Volume 1 (Main Report and Appendices)
16 Apr 2009The first volume of the Design Manual for Roads and Bridges Stage 2 Corridor Report for the Forth Replacement Crossing, including the main report and appendices
Forth Replacement Crossing: Main Crossing (Bridge) Scheme Assessment Report Development of D2M Alternatives
14 Apr 2009Report on the assessment of options for a narrower replacement crossing to carry a dual carriageway road with hard shoulders
Forth Replacement Crossing: Forth Road Bridge Feasibility of Multi-modal Corridor
14 Apr 2009Report on the feasibility of utilising the existing FRB for non motorised and public transport/light road traffic, incl for a potential future guided bus/tram/light rail facility
Forth Replacement Crossing: Main Crossing (Bridge) Scheme Assessment Report Development of Options
14 Apr 2009Report on the assessment of options for the outline design of the replacement crossing
Forth Replacement Crossing: Route Corridor Options Review
14 Apr 2009This report details the assessment work on nine mainline connecting road corridors identified: three in the northern and six in southern study areas. It recommended two northern and two southern corridor options be taken forward for further assessment
Forth Replacement Crossing: Managed Crossing Scheme: Scheme Definition Report
14 Apr 2009Summarises the previous reports listed – ie the development work carried out during 2008. In addition, explains how this work and updated information from FETA on the existing FRB was used as the basis for developing the Managed Crossing Scheme announced
Forth Replacement Crossing Study: Report 1 - Assessment of Transport Network
14 Feb 2007Assessment of existing and forecasted future conditions of the transport network within the corridors of Forth Road and Rail Bridges