A830 Arisaig to Loch nan Uamh

Project

Widening of single track length of A830 between Arisaig and Loch nan Uamh to allow for two way traffic.

A830 Dearg Bridge Replacement

Project

Transport Scotland replaced the old life expired A830 Dearg Bridge over the Dearg watercourse 4 mile west of Glenfinnan with a new wider bridge designed to modern standards.

A830 Garbh Bridge Replacement

Project

This is a scheme to replace the existing life expired A830 Garbh Bridge over a watercourse 5 miles west of Glenfinnan.

Media Results

A830 Utha Bridge Replacement

Project

This is a scheme to replace the existing life expired A830 Utha Bridge over a watercourse 2 miles west of Glenfinnan.

A876 Upper Forth Crossing at Kincardine

Project

Construction of a new 1.2 kilometre-long bridge across the Forth Estuary, together with 6.4 kilometres of approach road and associated works.

A887 Lagain Bhain Bridge Replacement

Project

The existing bridge is deemed to be beyond economic repair. Therefore, it is proposed to replace it with new reinforced concrete bridge with a span of 5.5 metres.

A898 Erskine Bridge Lighting and Electrical Refurbishment

Project

The £3.23M Erskine Bridge Lighting and Electrical Refurbishment contract was substantially completed on 11 November 2016.

A898 Erskine Bridge Vehicle Barrier Replacement

Project

This project involved the replacement of the existing vehicle barriers along the central reserve and nearside lane of the Erskine Bridge.

A9 Ballinluig Junction Improvements

Project

This scheme consisted of the provision of new slip roads on the west side of the A9 for Northbound travellers. The scheme officially opened on 26 May 2008.

A9 Bankfoot Junction Improvement

Project

Junction improvements to and from the village of Bankfoot have been undertaken to remove right turn manoeuvres.