DMRB Stage 2 Assessment Report - Hardmuir to Fochabers - A96 Dualling
Design Manual for Roads and Bridges Stage 2 Assessment for the Hardmuir to Fochabers section of the A96 Dualling.
Volume 1 - The Scheme and Engineering Assessment
Volume 2 - Environmental Assessment
Volume 3 - Traffic and Economic Assessment - Assessment Summary and Preferred Option Recommendation
Volume 5 - Figures
- View A96H2F Volume 5 Contents.pdf
- View Figure 1.2 – A96 between Hardmuir and Fochabers.pdf
- View Figure 2.2-2.4 – Engineering Conditions of the existing A96.pdf
- View Figure 2.5 – Existing Road Network Sections.pdf
- View Figure 2.6-2.8 – Existing A96 Speed Limit and Street Lighting.pdf
- View Figure 2.9 – Automatic Traffic Counter Locations on Existing A96.pdf
- View Figure 2.10-2.12 – Personal Injury Accidents 2012-2016.pdf
- View Figure 2.14-2.16 – Existing Conditions - Utilities.pdf
- View Figure 3.2 – Initial Constraints.pdf
- View Figure 3.3 – Feasible Corridors.pdf
- View Figure 3.4 – Initial Route Option Alignments.pdf
- View Figure 3.5 – Route Options Displayed at Public Exhibitions June 2017.pdf
- View Figure 3.6 – Pairwise Round 1 Assessment Locations.pdf
- View Figure 3.7 – Route Options Displayed at Public Exhibitions February & March 2018.pdf
- View Figure 3.8 – Pairwise Round 2 Assessment Locations.pdf
- View Figure 3.9 – Route Options Shown in Design Update August 2018.pdf
- View Figure 3.11 – Shortlisted Options.pdf
- View Figure 5.1-5.6 – Hardmuir to Hillhead North and South Option.pdf
- View Figure 5.7-5.10 – Hardmuir to Hillhead North and South Option Superficial Geology.pdf
- View Figure 5.11-5.14 – Hardmuir to Hillhead North and South Option Solid Geology.pdf
- View Figure 5.15-5.18 – Hardmuir to Hillhead North and South Option Geotechnical Constraints.pdf
- View Figure 6.1-6.8 – Hillhead to Lhanbryde North and South Option.pdf
- View Figure 6.9-6.14 – Hillhead to Lhanbryde North and South Option Superficial Geology.pdf
- View Figure 6.15-6.20 – Hillhead to Lhanbryde North and South Option Solid Geology.pdf
- View Figure 6.21-6.26 – Hillhead to Lhanbryde North and South Option Geotechnical Constraints.pdf
- View Figure 7.1-7.4 – Lhanbryde to East of Fochabers North and South Option.pdf
- View Figure 7.5-7.8 – Lhanbryde to East of Fochabers North and South Option Superficial Geology.pdf
- View Figure 7.9-7.12 – Lhanbryde to East of Fochabers North and South Option Solid Geology.pdf
- View Figure 7.13-7.16 – Lhanbryde to East of Fochabers N and S Option Geotech Constraints.pdf
- View Figure 8.1a-8.1d – Hardmuir to Hillhead North and South Option.pdf
- View Figure 8.2a-8.2f – Hillhead to Lhanbryde North and South Option.pdf
- View Figure 8.3a-8.3d – Lhanbryde to East of Fochabers North and South Option.pdf
- View Figure 9.1a-9.1d – Hardmuir to Hillhead N and S Option – LDP Des Sites and Planning Apps.pdf
- View Figure 9.2a-9.2f – Hillhead to Lhanbryde N and Option – LDP Des Sites and Planning Apps.pdf
- View Figure 9.3a-9.3d – Lhanbryde to Fochabers N and S Option – LDP Des Sites and Plan Apps.pdf
- View Figure 10.1a-10.3b – Affected Road Network (Air Quality).pdf
- View Figure 10.4-10.6 – Air Quality Monitoring.pdf
- View Figure 11.1a-b – Hardmuir to Hillhead – Noise Assessment Study Area and Calculation Area.pdf
- View Figure 11.2a-b – Noise Assessment Study Area and Calculation Area – Hillhead to Lhanbryde.pdf
- View Figure 11.3a-b – Noise Assessment Study Area and Calculation Area – Lhanbryde to Fochabers.pdf
- View Figure 11.4a-b – Opening Year Noise Change Contours - Hardmuir to Hillhead.pdf
- View Figure 11.5a-b – Opening Year Noise Change Contours - Hillhead to Lhanbryde.pdf
- View Figure 11.6a-b – Opening Year Noise Change Contours - Lhanbryde to East of Fochabers.pdf
- View Figure 12.1a-d – People and Communities Assessment – Hardmuir to Hillhead.pdf
- View Figure 12.2a-f – People and Communities Assessment – Hillhead to Lhanbryde.pdf
- View Figure 12.3a-d – People and Communities Assessment – Lhanbryde to East of Fochabers.pdf
- View Figure 13.2a-f – Agriculture, Forestry and Sporting Interests – Lhanbryde to Fochabers.pdf
- View Figure 15.1a-d – Visual Receptors – Hardmuir to Hillhead.pdf
- View Figure 15.2a-f – Visual Receptors – Hillhead to Lhanbryde.pdf
- View Figure 15.3a-d – Visual Receptors – Lhanbryde to East of Fochabers.pdf
- View Figure 16.1a-d – Cultural Heritage Sites – Hardmuir to Hillhead.pdf
- View Figure 16.2a-f – Cultural Heritage Sites – Hillhead to Lhanbryde.pdf
- View Figure 16.3a-d – Cultural Heritage Sites – Lhanbryde to East of Fochabers.pdf
- View Figure 17.1-17.3 – Landscape Designations.pdf
- View Figure 17.4-17.6 – Landscape Character.pdf
- View Figure 18.1a-d – Phase 1 Habitat Survey – Hardmuir to Hillhead.pdf
- View Figure 18.2a-f – Phase 1 Habitat Survey – Hillhead to Lhanbryde.pdf
- View Figure 18.3a-d – Phase 1 Habitat Survey – Lhanbryde to East of Fochabers.pdf
- View Figure 18.4 – Wintering Geese Survey Overview – Hardmuir to Hillhead & Hillhead to Lhanbryde.pdf
- View Figure 19.1a-d – Geology, Soils, Contaminated Land and Groundwater – Hardmuir to Hillhead.pdf
- View Figure 19.2a-f – Geology, Soils, Contaminated Land and Groundwater – Hillhead to Lhanbryde.pdf
- View Figure 19.3a-d – Geology, Soils, Contam Land and Groundwater – Lhanbryde to E of Fochabers.pdf
- View Figure 23.1-23.3– North & South Options 2030 & 2045 Predicted Daily Traffic Flows.pdf
- View Figure 26.1 – Preferred Option.pdf