This study sought to identify existing problems or opportunities for improvement. It has considered the safety and operational aspects of the corridor and the junctions, looking into the impact of existing and proposed traffic growth in the wider area as well as considering the strategic role the A9 plays for connectivity to the north of Scotland.
It has reviewed both current and future operations, taking account of potential and future developments within the surrounding area, and has been undertaken in line with Scottish Transport Appraisal Guidance (STAG).
The study represents the Initial Appraisal (Case for Change) stage of the STAG process (formerly known as the Pre-Appraisal stage) and sets out whether there is a case for change.
Accessible PDF version of report
- View Case For Change Publication March 2021 A9 North Kessock To Tore Study WSP Accessible
- View Appendix A Existing Junction Layouts A9 North Kessock To Tore Study WSP Accessible
- View Appendix B IMFLDP A9 North Kessock To Tore Study WSP Accessible
- View Appendix C Survey Locations A9 North Kessock To Tore Study WSP Accessible
- View Appendix D1 Introduction Letter PUB A9 North Kessock To Tore Study WSP Accessible
- View Appendix D2 Workshop One Notes 23 Sept A9 North Kessock To Tore Study WSP Accessible
- View Appendix D3 Workshop Two Notes 8 Oct A9 North Kessock To Tore Study WSP Accessible
- View Appendix E SIMD Map Of Study Area A9 North Kessock To Tore Study WSP Accessible
- View Appendix F Not Included
- View Appendix G Not Included
- View Appendix H Not Included
- View Appendix I Conflict Study Select Images March 2021 A9 North Kessock To Tore Study WSP Accessible
- View Appendix J Stakeholder List A9 North Kessock To Tore Study WSP Accessible
- View Appendix K Longlist Of Options A9 North Kessock To Tore Study WSP Accessible