This report sets out the option development and assessment process for a permanent long-term solution to the challenges at the Rest and Be Thankful.
- You can also visit the virtual exhibition.
Volume 1
Part 1 - The scheme, and Part 2 - Engineering assessment
Part 3 - Environmental assessment
Part 4 - Traffic and economic assessment
Part 5 - Assessment summary and recommendation
Volume 2 - Engineering drawings
PDF version
- View 1 Of 5 Volume 2 Engineering Drawings DMRB Stage 2 A83 Access To Argyll And Bute
- View 2 Of 5 Volume 2 Engineering Drawings DMRB Stage 2 A83 Access To Argyll And Bute
- View 3 Of 5 Volume 2 Engineering Drawings DMRB Stage 2 A83 Access To Argyll And Bute
- View 4 Of 5 Volume 2 Engineering Drawings DMRB Stage 2 A83 Access To Argyll And Bute
- View 5 Of 5 Volume 2 Engineering Drawings DMRB Stage 2 A83 Access To Argyll And Bute