Draft Orders and Environmental Impact Assessment Report – A90/A937 Laurencekirk Junction Improvement Scheme
We published draft Orders and an Environmental Impact Assessment Report for the proposed scheme on 19 December 2019 for formal comment. The Statutory Consultation Period closes on 14 February 2020. Representations to published draft Orders can be made to Transport Scotland at a90a937-laurencekirk-junction@transport.gov.scot before the closing date.
Draft Orders
The M90/A90/A9000 Trunk Road (A90/A937 Laurencekirk Junction Improvement) (Trunking) Order 201[ ]
The M90/A90/A9000 Trunk Road (A90/A937 Laurencekirk Junction Improvement) (Side Roads) Order 201[ ]
The M90/A90/A9000 Trunk Road (A90/A937 Laurencekirk Junction Improvement) Compulsory Purchase Order 201[ ]
- View The M90/A90/A9000 Trunk Road (A90/A937 Laurencekirk Junction Improvement) Compulsory Purchase Order 201[ ] Schedule
- View The M90/A90/A9000 Trunk Road (A90/A937 Laurencekirk Junction Improvement) Compulsory Purchase Order 201[ ] Plan - 1 of 2
- View The M90/A90/A9000 Trunk Road (A90/A937 Laurencekirk Junction Improvement) Compulsory Purchase Order 201[ ] Plan - 2 of 2
Environmental Impact Assessment Report
Volume 1 - Non-technical summary
Volume 2 - Main Report
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 0 Cover Page
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 1 Introduction
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 2 The Scheme + Alternative Considered
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 3 Planning Policy
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 4 Environmental Impact Assessment Process + Method
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 5 Consultation
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 6 Air Quality
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 7 Cultural Heritage
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 8 Landscape
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 9 Noise + Vibration
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 10 Nature Conservation + Biodiversity
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 11 Road Drainage + The Water Environment
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 12 People + Communities
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 13 Geology + Soils
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 14 Materials
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 15 Interactions + Cumulative Effects
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 16 Schedule Of Environmental Committment
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 17 Summary + Conclusion
- View Volume 2 A90 A937 Laurencekirk Junction EIAR Chapter 18 References
Volume 3 - Figures
- View Figure 0 Cover
- View Figure 1.1 Scheme Location
- View Figure 1.2 Scheme Design
- View Figure 1.3 Scheme Design Aerial
- View Figure 2.1 Design Alternatives Options 1A & 1B
- View Figure 2.2 Design Alternatives Options 1C & 1D
- View Figure 2.3 Design Alternatives Option 2D
- View Figure 2.4 Design Alternatives Option 3
- View Figure 6.1 Do Minimum Affected Road Links
- View Figure 6.2 Do Something Affected Road Links
- View Figure 6.3 Construction Phase Sensitive Receptors
- View Figure 6.4 Existing Sensitive Receptor And Monitoring Locations
- View Figure 7.1 Historic Environment Record
- View Figure 7.2 Historic Land Use Assessment
- View Figure 8.1 LVIA Study Area And Topography
- View Figure 8.2 Zone Of Theoretical Visibility
- View Figure 8.3 Landscape Character Types
- View Figure 8.4 Significant Landscape Assets
- View Figure 8.5 Visual Receptors And Viewpoint Locations
- View Figure 8.6 Viewpoint 2 Core Path Route 3 And Minor Road Connecting The A937 (North Of The A90) To The A90
- View Figure 8.7 Viewpoint 5 – Oatyhill And A90
- View Figure 8.8 Viewpoint 6 – A937 South Of The A90
- View Figure 8.9 Viewpoint 8 – South West Along The A90 Carriageway
- View Figure 8.10 Landscape Design Plan
- View Figure 9.1 Calculation Area For Noise & Vibration And Representative Receptors
- View Figure 9.2 Noise Change Contours Do Something Short Term
- View Figure 9.3 Noise Change Contours Do Minimum Long Term
- View Figure 9.4 Noise Change Contours Do Minimum Long Term Night Time
- View Figure 9.5 Noise Change Contours Do Something Long Term
- View Figure 9.6 Noise Change Contours Do Something Long Term Night Time
- View Figure 10.1 Designated Sites And Priority Habitats
- View Figure 10.2 Phase 1 Habitat Survey
- View Figure 10.3 Bat Activity Survey Results
- View Figure 10.4A Breeding Bird Survey Results April And May 2017
- View Figure 10.4B Breeding Bird Survey Results June 2017
- View Figure 10.5A Breeding Bird Survey Results January 2018
- View Figure 10.5B Wintering Bird Survey Results February 2018
- View Figure 10.5C Wintering Bird Survey Results March 2018
- View Figure 10.6 Red Squirrel Survey Map
- View Figure 10.7 Badger Field Signs
- View Figure 10.8 Aquatic Invertebrate Survey
- View Figure 11.1 Surface Waterbodies And Surface Water Catchments
- View Figure 11.2 Groundwater Bodies
- View Figure 11.3 Flood Risk
- View Figure 11.4 Water Vunerable Zones
- View Figure 11.5 Abstractions
- View Figure 12.1 Community Land Use
- View Figure 12.2 School Catchment Areas
- View Figure 12.3 Development Areas
- View Figure 12.4 Non Motorised User Routes
- View Figure 12.5 NMU Survey Points
- View Figure 13.1 Bedrock Geology
- View Figure 13.2 Superficial Geology
- View Figure 13.3 Land Capability For Agriculture
- View Figure 13.4 Soil Map For Scotland (1 25000)
- View Figure 13.5 Geological And Contaminated Land Constraints
- View Figure 13.6 Land Capability For Forestry
- View Figure 14.1 Utilities Layout
- View Figure 14.2 Waste Resources
- View Figure 15.1 Developments For Cumulative Effects
Volume 4 - Technical Appendices
- View Volume 4 Appendix 0 Cover Page
- View Volume 4 Appendix 5 Consultation
- View Volume 4 Appendix 6 Air Quality
- View Volume 4 Appendix 8 Landscape
- View Volume 4 Appendix 9 Noise And Vibration
- View Volume 4 Appendix 10 Ecology And Nature Conservation
- View Volume 4 Appendix 11 Road Drainage And The Water Environment
- View Volume 4 Appendix 13.1
- View Volume 4 Appendix 13.2 Historical Borehole Logs Part 1
- View Volume 4 Appendix 13.2 Historical Borehole Logs Part 2
Published Date
19 Dec 2019
Type
Projects
Mode of transport