Draft Orders and Environmental Impact Assessment Report - A985 Kincardine Bridge
Transport Scotland published draft Orders and an Environmental Impact Assessment Report (EIAR) for the proposed scheme on 27 October 2020. A statutory Objection period of six weeks starting 27 October to 8 December will take place. Within this period, Transport Scotland invites comments on the proposals.
If you would like to make any comments for the EIA or objections to the CPO, please email info@transport.gov.scot.
Draft Orders
Southern Piled Viaduct Refurbishment
- View A985 Kincardine Bridge - Southern Piled Viaduct - CPO Plan
- View A985 Kincardine Bridge - Southern Piled Viaduct - Land Reference Plan
- View A985 Kincardine Bridge - Southern Piled Viaduct - Refurbishment - CPO Draft CPO Updated
- View A985 Kincardine Bridge - Southern Piled Viaduct - Refurbishment - CPO Draft Notice To Owner Unknown - HG Signed
- View A985 Kincardine Bridge - Southern Piled Viaduct Refurbishment - CPO Draft Press Notice HG Signed
- View A985 Kincardine Bridge - Piled Viaduct Replacement - EIA Notice - HG Signed
Environmental Impact Assessment Report
Habitats Regulations Appraisal
- View A985 Kincardine Bridge Piled Viaduct Replacement - Environmental Impact Assessment Record of Decision
- View A985 Kincardine Bridge - Habitats Regulations Appraisal
- View HRA Figure 1 - Site Location Plan
- View HRA Figure 2 - Existing Piled Viaduct
- View HRA Figure 3 - Proposed Piled Viaduct General Arrangement
- View HRA Figure 4A - Temporary Diversion Structure Indicative General Arrangement
- View HRA Figure 4B - Temporary Diversion Structure Indicative General Arrangement
- View HRA Figure 4C - Temporary Diversion Structure Indicative General Arrangement
- View HRA Figure 5 - Designated Sites
- View HRA Figure B1 - Bird Survey
- View HRA Figure B2 - Through The Tide Count Survey Results
- View HRA Figure B3 - Goose Roost Survey Results
Volume 1
- View Volume 1 - Main Report Front Page, Contents, Glossary And Abbreviations
- View Chapter 01 - Introduction
- View Chapter 02 - Need For The Scheme And Consideration Of Alternatives
- View Chapter 03 - The Proposed Scheme
- View Chapter 04 - Overview Of Assessment Process
- View Chapter 05 - Consultation And Scoping
- View Chapter 06 - Geology Soils And Groundwater
- View Chapter 07 - Road Drainage And The Water Environment
- View Chapter 08 - Marine Ecology
- View Chapter 09 - Terrestrial Ecology
- View Chapter 10 - Cultural Heritage
- View Chapter 11 - Air Quality
- View Chapter 12 - Noise And Vibration
- View Chapter 13 - Material Assets And Waste
- View Chapter 14 - Human Health
- View Chapter 15 - Climate For Publication
- View Chapter 16 - Assessment Of Cumulative Effects
- View Chapter 17 - Schedule Of Environmental Commitments
- View Chapter 18 - Summary Of Significant Residual Effects
Volume 2
- View Volume 2 Technical Appendices Front Page And Contents
- View Appendix A1.3 Statement Of Competency
- View Appendix A3.1 Construction Information
- View Appendix A3.2 Outline Construction Environmental Management Plan
- View Appendix A4.1 Assessment Of Policy
- View Appendix A5.1 Summary Of Consultation Responses
- View Appendix A8.1 - Saltmarsh Baseline Data
- View Appendix A8.2 - Outline Saltmarsh Management Plan
- View Appendix A9.1 - Species Names
- View Appendix A9.2 - Detailed Methods And Baseline Data
- View Appendix A9.3 - Confidential Ecology Features
- View Appendix A9.4 - Outline Ecological Management Plan
- View Appendix A10.1 - Cultural Heritage Baseline Report
- View Appendix A11.1 - Air Quality Dust Risk Assessment
- View Appendix A12.1 - Glossary Of Acoustical Terminology
- View Appendix A12.2 - Sound Level Meter Calibration Certificate
- View Appendix A13.1 - Assessment Of Regulatory And Policy Compliance
- View Appendix A13.2 Waste Sites And Capacities
Volume 3
- View Volume 3 - Figures Front Page And Contents
- View Figure 1.1 - Site Location Plan
- View Figure 1.2A Main Environmental Constraints
- View Figure 1.2B Main Environmental Constraints
- View Figure 3.1 The Proposed Scheme
- View Figure 3.2 Existing Piled Viaduct
- View Figure 3.3 Proposed Piled Viaduct General Arrangement
- View Figure 3.4 Proposed Piled Viaduct General Arrangement
- View Figure 3.5 Proposed Piled Viaduct General Arrangement
- View Figure 3.6 Temporary Diversion Structure Indicative General Arrangement
- View Figure 3.7 Temporary Diversion Structure Indicative General Arrangement
- View Figure 3.8 Temporary Diversion Structure Indicative General Arrangement
- View Figure 3.9 Temporary Diversion Structure Indicative General Arrangement
- View Figure 3.10 Proposed Scheme Land Take
- View Figure 6.1 Potentially Contaminated Land
- View Figure 6.2 GI Borehole Locations
- View Figure 7.1 Surface Water Features
- View Figure 7.2 Coastal Water Flood Risk
- View Figure 8.1 Ecological Designations
- View Figure 8.2 Saltmarsh Survey Results
- View Figure 9.1 Bird Survey Area
- View Figure 9.2 Phase 1 Habitat Survey Results
- View Figure 9.3 Bat Survey Results
- View Figure 9.4 Through The Tide Count Survey Results
- View Figure 9.5 Goose Roost Survey Results
- View Figure 9.6 Breeding Birds Survey Results
- View Figure A10.1 - Locations Of Archaeological Remains And Historic Buildings
- View Figure A10.2 - Locations Of Historic Landscape Types
- View Figure 10.3 - Potential For Unknown Archaeological Remains
- View Figure A10.3 - Potential For Unknown Archaeological Remains
- View Figure 11.1 - Affected Roads And Human Receptors
- View Figure 11.2 - Construction Dust Assessment
- View Figure 13.1 - Operational Waste Sites
- View Figure 10.1 Locations Of Archaeological Remains And Historic Buildings
- View Figure 10.2 Locations Of Historic Landscape Types