313 Publications Filtered by Search: paid invoices

Filter by:

Baseline Data Collection and Analysis - Evaluation of the Levenmouth Rail Link Reopening

18 Dec 2024

This report summarises the findings from the baseline study conducted prior to the reopening of the Levenmouth rail link.

Rail Enforcement Powers Working Group - Final Report and Recommendations

11 Feb 2026

The Rail Enforcement Powers Working Group has submitted its final report to Scottish Ministers for their consideration. The Group has endorsed 11 recommendations that have been developed to maximise safety for all passengers and staff on Scotland's railway.

Blind Companion Free Rail Travel Pilot - Evaluation report

11 Mar 2026

The findings from the evaluation of the blind companion free rail travel pilot, including results from the baseline and follow-up studies

Forth Replacement Crossing: Main Crossing (Bridge) Scheme Assessment Report Development of D2M Alternatives

14 Apr 2009

Report on the assessment of options for a narrower replacement crossing to carry a dual carriageway road with hard shoulders

Forth Replacement Crossing: Main Crossing (Bridge) Scheme Assessment Report Development of Options

14 Apr 2009

Report on the assessment of options for the outline design of the replacement crossing

Forth Replacement Crossing: DMRB Stage 2 Corridor Report: Volume 1 (Main Report and Appendices)

16 Apr 2009

The first volume of the Design Manual for Roads and Bridges Stage 2 Corridor Report for the Forth Replacement Crossing, including the main report and appendices

Mobility and Access Committee for Scotland (MACS) - Main Committee Meeting - Minutes - 19 October 2021

27 Apr 2022

The Mobility and Access Committee (MACS) meet as a committee every month.

Mobility and Access Committee for Scotland (MACS) - Main Committee Meeting - Minutes - 25 January 2022

27 Apr 2022

The Mobility and Access Committee (MACS) meet as a committee every month.

Part 1 claims - Aberdeen Western Peripheral Route and Balmedie to Tipperty

5 Jun 2019

Claim form under Part I of the Land Compensation (Scotland) Act 1973 (as amended) for the Aberdeen Western Peripheral Route and Balmedie to Tipperty

Landslide forecast, detection and notification part one - July 2024 - SRRB

12 Jul 2024

Automatic movement detection and continuous monitoring of events and subsurface conditions at the Rest and Be Thankful

Page 29 of 32