Environmental Statement - M74 Junction 5 Raith - M8 M73 M74 Motorway Improvements
Appendices
- View 6.1 Air Quality Modelling and Impacts
- View 10.1 Extended Phase 1 Habitat Survey
- View 10.2 National Vegetation Classification (NVC) Survey
- View 10.3 Otter and Water Vole Survey 2004 to 2006
- View 10.4 Great Crested Newt Survey, 2004-2006
- View 10.5 Breeding Bird Survey 2004 - 2005
- View 10.6 Wintering Bird Survey 2004 - 2006
- View 10.7 Aquatic Invertebrate Survey 2006
- View 10.8 Bat Survey 2006
- View 12.1 Glossary of Acoustical Terminology
- View 12.2 DMRB Summary Tables
- View 15.1 Water Quality Calculations
- View 16.1 Contamination Assessment Report
- View 16.2 Geotechnical Interpretative Report
- View 16.2 Drawing 1313
- View 16.2 Drawing 1314
- View 16.2 Drawing 1316
- View 16.3 Groundwater Assessment Report
- View 16.3 Groundwater Assessment Report Appendices
- View 16.3 Groundwater Assessment Report Figures
- View 16.4 Preliminary Hydrogeological Assessment Report
- View 16.4 Figure 1
- View 16.4 Figure 2A
- View 16.4 Figure 2B
- View 16.4 Figure 2C
- View 16.4 Figure 3
- View 16.4 Figure 4
- View 16.4 Figure 5
List of figures
- View 1.1 Scheme Location
- View 2.1 Option B(ii) Schematic
- View 2.2 Option C(ii) Schematic
- View 2.3 Option D Schematic
- View 3.1a A725 Plan and Profile
- View 3.1c M74(N) Diverse Proposal Layout
- View 3.1b M74(S) Diverge Proposal
- View 3.1d A725(S) Diverge
- View 3.1e Proposed Layout A725(S) Merge
- View 3.1f A725(N) Diverge Proposal Layout
- View 3.1g A725(N) Merge Proposal Layout
- View 6.1 Local Air Quality Receptor Locations
- View 6.2 Detailed Locations of Receptors: Receptors 1 to 42
- View 6.3 Detailed Locations of Receptors: Receptors 45 to 61
- View 6.4 Predicted Changes in Air Quality at Residential Properties
- View 7.1 Cultural Heritage Features
- View 8.1 Land Use - Development and Community Land
- View 8.2 Land Use - Land Capability for Agriculture
- View 10.1 Phase 1 Habitat Survey
- View 10.2 NVC Survey of SSSI and SINCs
- View 10.3 Phase 2 Vegetation Survey of the Land Take Within the SSSI, Laighland and Bothwell Bridge Areas
- View 10.4 Otter and Water Vole Activity
- View 10.5 Distribution of Bird Species Listed in Birds of Conservation Concern
- View 10.6 Breeding Bird Distribution in 2005
- View 11.1 Landscape Effects - Baseline Landscape
- View 11.2 Landscape Effects - Landscape Character & Context
- View 11.3 Landscape Effects - Landscape Quality & Visual Effects
- View 11.4 Photo Viewpoint 1
- View 11.5 Photo Viewpoint 2
- View 11.6 Photo Viewpoint 3
- View 11.7 Photo Viewpoint 4
- View 11.8 Photo Viewpoint 5
- View 11.9 Photo Viewpoint 6
- View 11.10 Photo Viewpoint 7
- View 11.11 Photo Viewpoint 8
- View 11.12 Photo Viewpoint 9
- View 11.13 Photo Viewpoint 10
- View 11.14 Photo Viewpoint 11
- View 11.15 Photo Viewpoint 12
- View 11.16 Photo Viewpoint 13
- View 12.1(a) Cumulative Impact with Scheme without Mitigation - Raith Do-Min
- View 12.1(b) Cumulative Impact with Scheme without Mitigation - Raith Do-Min
- View 12.2(a) Potential Impact with Scheme without mitigation - Committed Do-Min
- View 12.2(b) Cumulative Impact scheme without mitigation - Committed Do-Min
- View 12.3(a) Cumulative Impact with scheme with Mitigation - Raith Do-Min
- View 12.3(b) Cumulative Impact with scheme with Mitigation - Raith Do-Min
- View 12.4 (a) Cumulative Impact with scheme with Mitigation - Committed Do-Min
- View 12.4(b) Cumulative Impact with scheme with Mitigation - Committed Do-Min
- View 12.5(a) 1dB Changes Wider Study area - Raith Do-Min
- View 12.6 1dB Changes Wider Study area - Committed Do-Min
- View 12.7 Extent of Proposed Mitigation
- View 12.8 Amenities, Recreational Areas and Buildings with Scheme - Raith Do-Min
- View 12.9 Extents of Modelled Road Surfaces
- View 13.1 Distribution of Zero Car Households
- View 13.2 Existing NMU Facilities
- View 13.3 Proposed NMU Facilities (1 of 4)
- View 13.4 Proposed NMU Facilities (2 of 4)
- View 13.5 Proposed NMU Facilities (3 of 4)
- View 15.1 Watercourse Catchment Boundaries
- View 13.6 Proposed NMU Facilities (4 of 4)
- View 15.2 Raith Junction Drainage Layout
- View 15.3 Indicative Flood Inundation Envelopes
- View 15.4 Location of Flood Plain Compensatory Storage
- View 15.5 Longitudinal Profile of Unnamed Burn Diversional Cross-Sections Through Compensatory Storage and SUDS
- View 16.1 Soil and Water Contamination
- View 20.1 Conceptual Mitigation Strategy
- View 20.2 Landscape Effects: Flood Compensatory Storage Area Cross Section (A & B)
- View 20.3 Landscape Effects: Flood Compensatory Storage Area Cross Section (C & D)
- View 20.4 Photo Viewpoint 4 - Photomontage
- View 20.5 Photo Viewpoint 8 - Photomontage
- View 20.6 Photo Viewpoint 10 - Photomontage
- View 20.7 Photo Viewpoint 11 - Photomontage
Published Date
19 Mar 2007
Type
Projects
Mode of transport