Draft Orders and Environmental Statement - A9 Tay Crossing to Ballinluig
The draft Orders and Environmental Statement for the A9 Dualling Tay Crossing to Ballinluig project were published on 31 July 2018. The Statutory Consultation Period closes on 11 September 2018.
Representations to the draft Orders, including objections, can be made in writing to Transport Scotland, by 11 September 2018 at the latest, to the following address: Director of Major Transport Infrastructure Projects Transport Scotland Buchanan House 58 Port Dundas Road Glasgow G4 0HF or by email to: a9dualling@transport.gov.scot.
Objections should state the name and address of the objector, the Order to which they related and the grounds on which they were made. Any information we collect in this manner will only be used by Transport Scotland to consider objections to the draft Orders.
Transport Scotland and their consultants Jacobs UK will contact objectors with a view to resolving their objection if possible. Your information will not be shared with any partners for marketing which you have not agreed to.
More information on how we process personal information
Notices
- View A9 Dualling Tay Crossing to Ballinluig Compulsory Purchase Order Notice 31 July 2018.pdf
- View A9 Dualling Tay Crossing to Ballinluig Compulsory Purchase Order Owner Occupier Notice 31 July 2018.pdf
- View A9 Dualling Tay Crossing to Ballinluig Compulsory Purchase Order Unknown Notice 31 July 2018.pdf
- View A9 Dualling Tay Crossing to Ballinluig Environmental Statement Notice 31 July 2018.pdf
- View A9 Dualling Tay Crossing to Ballinluig Environmental Statement Notice of Determination 31 July 2018.pdf
- View A9 Dualling Tay Crossing to Ballinluig Side Roads Notice 31 July 2018.pdf
Draft Orders
The A9 Trunk Road (Tay Crossing to Ballinluig) (Side Roads) Order 201[ ]
The A9 Trunk Road (Tay Crossing to Ballinluig) Compulsory Purchase Order 201[]
- View The A9 Trunk Road (Tay Crossing to Ballinluig) Compulsory Purchase Order 201[] Schedule.pdf
- View CPO Drawing 1 of 8.pdf
- View CPO Drawing 2 of 8.pdf
- View CPO Drawing 3 of 8.pdf
- View CPO Drawing 4 of 8.pdf
- View CPO Drawing 5 of 8.pdf
- View CPO Drawing 6 of 8.pdf
- View CPO Drawing 7 of 8.pdf
- View CPO Drawing 8 of 8.pdf
Environmental Statement
Non-Technical Summary
View Digital Non-Technical Summary
Volume 1 - Main Report
- View Chapter 01 - Introduction.pdf
- View Chapter 02 - Need for the Scheme.pdf
- View Chapter 03 - Alternatives Considered.pdf
- View Chapter 04 - Iterative Design Development.pdf
- View Chapter 05 - The Proposed Scheme.pdf
- View Chapter 06 - Overview of Assessment Process.pdf
- View Chapter 07 - Consultation and Scoping.pdf
- View Chapter 08 - People and Communities - Community and Private Assets.pdf
- View Chapter 09 - People and Communities - All Travellers.pdf
- View Chapter 10 - Geology, Soils, Contaminated Land and Groundwater.pdf
- View Chapter 11 - Road Drainage and the Water Environment.pdf
- View Chapter 12 - Ecology and Nature Conservation.pdf
- View Chapter 13 - Landscape.pdf
- View Chapter 14 - Visual.pdf
- View Chapter 15 - Cultural Heritage.pdf
- View Chapter 16 - Air Quality.pdf
- View Chapter 17 - Noise and Vibration.pdf
- View Chapter 18 - Materials.pdf
- View Chapter 19 - Policies and Plans.pdf
- View Chapter 20 - Cumulative Impacts.pdf
- View Chapter 21 - Schedule of Environmental Commitments.pdf
- View Chapter 22 - Summary of Significant Residual Impacts.pdf
- View Cover, Contents, Glossary and Abbreviations.pdf
Volume 2- Technical Appendices
- View Appendix A2.1 - Strategic Environmental Design Principles.pdf
- View Appendix A2.2 - Strategic Environmental Assessment (SEA) Monitoring Framework.pdf
- View Appendix A5.1 - Construction Information.pdf
- View Appendix A7.1 - Engaging Communities Booklet.pdf
- View Appendix A7.2 - Summary of Consultation Responses.pdf
- View Appendix A7.3 - Record of Determination.pdf
- View Appendix A8.1 - Land Capability Assessment Descriptors.pdf
- View Appendix A8.2 - Farm Business Survey.pdf
- View Appendix A8.3 - Forestry Survey.pdf
- View Appendix A8.4 - Agriculture, Forestry and Sporting Land Pre- and Post-Mitigation Impacts.pdf
- View Appendix A9.1 - Impact Assessment for NMU Routes and Access to Outdoor Areas.pdf
- View Appendix A10.1 - Contaminated Land Sources.pdf
- View Appendix A10.2 - Ecological Receptors with Potential Groundwater Component.pdf
- View Appendix A10.3 - Infrastructure, Properties and Cultural Heritage Receptors.pdf
- View Appendix A10.4 - Surface Water Indirect Dewatering Assessment.pdf
- View Appendix A11.1 - Baseline Conditions.pdf
- View Appendix A11.2 - Surface Water Hydrology.pdf
- View Appendix A11.3 - Flood Risk Assessment.pdf
- View Appendix A11.4 - Hydraulic Modelling Report.pdf
- View Appendix A11.5 - Fluvial Geomorphology.pdf
- View Appendix A11.6 - SuDS and Water Quality.pdf
- View Appendix A11.7 - Impact Assessment.pdf
- View Appendix A11.8 - Water Crossings Report.pdf
- View Appendix A12.1 - Scientific Names.pdf
- View Appendix A12.2 - Baseline Data and Detailed Survey Methods.pdf
- View Appendix A12.3 - Confidential Ecology Features.pdf
- View Appendix A13.1 - Landscape Character Areas.pdf
- View Appendix A13.2 - Special Qualities of the River Tay (Dunkeld) NSA.pdf
- View Appendix A13.3 - Assessment of Residual Indirect Impacts on Landscape Character Areas.pdf
- View Appendix A13.4 - Strategic Environmental Design Principles - Landscape.pdf
- View Appendix A13.5 - Landscape Objectives.pdf
- View Appendix A13.6 - SuDS Design Principles.pdf
- View Appendix A14.1 - Built Receptor Assessment.pdf
- View Appendix A14.2 - Outdoor Receptor Assessment.pdf
- View Appendix A15.1 - Cultural Heritage Baseline Information.pdf
- View Appendix A15.2 - Geophysical Survey Results.pdf
- View Appendix A15.3 - Geophysical Survey Results Kindallachan Cairn and Standing Stone.pdf
- View Appendix A15.4 - Cultural Heritage Impact, Mitigation and Residual Impact Tables.pdf
- View Appendix A16.1 - Air Quality Annexes.pdf
- View Appendix A17.1 - Noise and Vibration Terminology.pdf
- View Appendix A17.2 - Detailed Baseline Noise Survey Results.pdf
- View Appendix A17.3 - Predicted Noise Levels at Noise Sensitive Receptors.pdf
- View Appendix A17.4 - Noise Impacts on Committed Developments.pdf
- View Appendix A17.5 - Noise Impacts on Amenity Areas.pdf
- View Appendix A17.6 - Operational Residual Noise Impacts.pdf
- View Appendix A17.7 - Noise Sensitive Receptors Closest to Construction Works.pdf
- View Appendix A19.1 - Planning Policy Context for Environmental Assessment.pdf
- View Appendix A19.2 - Assessment of Development Plan Policy Compliance.pdf
- View Cover and Contents.pdf
Volume 3- Figures
- View Figure 1.1 - A9 Dualling Projects Overview.pdf
- View Figure 1.2 - Tay Crossing to Ballinluig Overview.pdf
- View Figure 3.1 - DMRB Stage 2 Route Options 1 & 2.pdf
- View Figure 3.2 - DMRB Stage 2 Route Options 3 & 4.pdf
- View Figure 3.3 - DMRB Stage 2 Dowally to Kindallachan Side Road Options.pdf
- View Figure 3.4 - DMRB Stage 2 Haugh of Kilmorich to Inch Farm Side Road Options.pdf
- View Figure 3.5 - DMRB Stage 2 Eastern Offline Route Options.pdf
- View Figure 3.6 - DMRB Stage 2 Preferred Route Option.pdf
- View Figure 5.1a-d - Tay Crossing to Ballinluig Overview.pdf
- View Figure 5.2a-d - Indicative Construction Land Made Available.pdf
- View Figure 8.1a-d - Community Assets and Development Land.pdf
- View Figure 8.2a-d - Proposed Scheme Land-take.pdf
- View Figure 8.3a-m - Changes in Vehicle Access to the A9.pdf
- View Figure 8.4a-i - Changes in Vehicle Access from the A9.pdf
- View Figure 9.1a-e - Existing Non-Motorised User (NMU) Routes.pdf
- View Figure 9.2a-f - Potential Impacts on Non-Motorised User (NMU) Routes and Proposed Mitigation.pdf
- View Figure 9.3a-e - Views from the Existing A9.pdf
- View Figure 10.1a-d - Private Water Supplies.pdf
- View Figure 10.2a-d - Potentially Contaminated Land.pdf
- View Figure 11.1a-d - Surface Water Features.pdf
- View Figure 11.2a-d - Baseline Flood Risk.pdf
- View Figure 11.3a-d - Change in Flood Level (with mitigation).pdf
- View Figure 11.4a-d - Drainage Catchments.pdf
- View Figure 12.1a-d - Ecological Designations.pdf
- View Figure 12.2a-e - Phase 1 Habitat Survey.pdf
- View Figure 12.3a-b - Wildcat Habitat Suitability Model Records.pdf
- View Figure 12.4 - Badger Survey Results (Confidential).pdf
- View Figure 12.5a-e - Bat Roost Survey Results.pdf
- View Figure 12.6a-e - Bat Activity Survey Results.pdf
- View Figure 12.7a-e - Breeding Birds Survey Results.pdf
- View Figure 12.8 - Otter Survey Results (Confidential).pdf
- View Figure 12.9a-d - Incidental Results.pdf
- View Figure 12.10a-e - Reptile Survey Results.pdf
- View Figure 12.11a-e - Aquatic Survey Results.pdf
- View Figure 12.12 - Freshwater Pearl Mussel FWPM) Survey Results (Confidential).pdf
- View Figure 12.13 - Badger Bait Marking Records (Confidential).pdf
- View Figure 12.14a-d - Ancient Woodland Inventory (AWI) Loss and Compensation.pdf
- View Figure 12.15a-e - Updated Phase 1 Habitat Survey (2017).pdf
- View Figure 13.1 - Landscape Designations and other associated Designations.pdf
- View Figure 13.2 - Landscape Character Plan.pdf
- View Figure 13.3 - Landscape Features Plan.pdf
- View Figure 13.4 - Visibility Analysis.pdf
- View Figure 13.5a-h - Landscape and Ecological Mitigation.pdf
- View Figure 13.6a-i - Cross Sections.pdf
- View Figure 13.7 - Typical Planting Structures.pdf
- View Figure 14.1 - Zone of Theoretical Visibility (ZTV) Existing A9.pdf
- View Figure 14.2 - Zone of Theoretical Visibility (ZTV) Proposed Scheme.pdf
- View Figure 14.3a-c - Visual Impacts on Built Receptors.pdf
- View Figure 14.4a-b - Visual Impacts on Outdoor Receptors.pdf
- View Figure 14.5 - Viewpoint Location Plan.pdf
- View Figure 14.6-14.16 - Visualisatons.pdf
- View Figure 15.1a-e - Archaeological Remains and Historic Buildings.pdf
- View Figure 15.2a-b - Historic Landscape Types.pdf
- View Figure 15.3a-d - Potential for Unknown Archaeological Remains.pdf
- View Figure 15.4a-b - Kindallachan Standing Stone (Asset 225) Photomontage.pdf
- View Figure 16.1a-b - Location of Construction Assessment Study Area and Receptors.pdf
- View Figure 16.2a-d - Air Quality Locations of Selected Sensitive Receptors.pdf
- View Figure 16.3 - Air Quality Monitoring Sites.pdf
- View Figure 17.1a-b - Noise and Vibration Study Area and Calculation Area.pdf
- View Figure 17.2a-b - Baseline Noise Monitoring Locations and Sample Receptors.pdf
- View Figure 17.3a-d - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Minimum Future Assessment Year.pdf
- View Figure 17.4a-d - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Minimum Future Assessment Year.pdf
- View Figure 17.5a-d - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year.pdf
- View Figure 17.6a-d - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year.pdf
- View Figure 17.7a-d - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Future Assessment Year.pdf
- View Figure 17.8a-d - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Something Future Assessment Year.pdf
- View Figure 17.9a-d - Location of Noise Sensitive Receptor (NSR) Specific Mitigation.pdf
- View Figure 17.10a-d - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year (with Mitigation).pdf
- View Figure 17.11a-d - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year (with Mitigation).pdf
- View Figure 17.12a-d - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Future Assessment Year (with Mitigation).pdf
- View Figure 17.13a-d - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Something Future Assessment Year (with Mitigation).pdf
- View Figure 18.1 - Materials and Waste Baseline.pdf
- View Covers and Contents.pdf