Document library

Information presented at Public Exhibitions

7-9 December 2016

An Artist’s Impression of the proposed Scheme has been developed and this is available in the following electronic visualisations:

Draft Orders and Environmental Statement

The draft Orders and an Environmental Statement for the proposed scheme were published on 29 November 2016. The Statutory Consultation Period closed on 31 January 2017 and Transport Scotland is now considering the representations received.

The A96 Trunk Road (Inverness to Nairn (including Nairn Bypass)) (Trunking & Detrunking) Order 201[ ]

The A96 Trunk Road (Inverness to Nairn (including Nairn Bypass)) (Side Roads) Order 201[ ]

The A96 Trunk Road (Inverness to Nairn (including Nairn Bypass)) (Extinguishment of Public Rights of Way) Order 201[ ]

The A96 Trunk Road (Inverness to Nairn (including Nairn Bypass)) Compulsory Purchase Order 201[ ]

Environmental Statement

Volume 1 – Main Report Volume 2 – Technical Appendices
Volume 3 – Figures

Public consultation

A number of public consultation events have been held on the scheme since February 2012. The material presented at these consultation events are available from the links below:

Preferred Option Design Update Drop In Sessions – February 2016

Meet the team - August 2015

Public Exhibitions – Preferred Option – October 2014

Route Option Refinements following November 2013 Exhibition

Public Exhibitions – Route Options – November 2013

Public Exhibitions – A96 Inshes to Nairn – February 2012

Documents and Reports

A number of reports have been published for the A96 Dualling Inverness to Nairn (including Nairn Bypass) Scheme. These are available to download in PDF format from the links below:

DMRB Stage 3 Report – Published December 2016

DMRB Stage 2 Report – Published October 2014

Volume 1 - Main Report and Appendices Volume 2 - Engineering Drawings
Volume 3 - Environmental Figures