Draft Orders and Environmental Statement - Killiecrankie to Glen Garry - A9 Dualling
The draft Orders and Environmental Statement for the A9 Dualling Killiecrankie to Glen Garry project were published on 28 November 2017. The Statutory Consultation Period closes on 23 January 2018.
Representations to the draft Orders, including objections, can be made in writing to Transport Scotland, by 23 January 2018 at the latest, to the following address:
Director of Major Transport Infrastructure Projects
Transport Scotland
Buchanan House
58 Port Dundas Road
Glasgow G4 0HF
or by email to: a9dualling@transport.gov.scot.
Objections should state the name and address of the objector, the Order to which they related and the grounds on which they were made.
Notices
- View Trunking and Side Roads Notice - 28 Nov 2017 - Killiecrankie to Glen Garry - A9 Dualling.pdf
- View Rights of Way Notice - 28 Nov 2017 - Killiecrankie to Glen Garry - A9 Dualling.pdf
- View Environmental Statement Notice - 28 Nov 2017 - Killiecrankie to Glen Garry - A9 Dualling.pdf
- View Environmental Statement Notice of Determination - 28 Nov 2017 - Killiecrankie to Glen Garry - A9 Dualling.pdf
- View Compulsory Purchase Order Notice - 28 Nov 2017 - Killiecrankie to Glen Garry - A9 Dualling.pdf
- View Compulsory Purchase Order Owner-Occupier Notice - 28 Nov 2017 - Killiecrankie to Glen Garry - A9 Dualling.pdf
- View Compulsory Purchase Order Unknown Notice – 28 Nov 2017 - Killiecrankie to Glen Garry - A9 Dualling.pdf
Draft orders
The A9 Trunk Road (Killiecrankie to Glen Garry) (Trunking) Order 201[ ]
The A9 Trunk Road (Killiecrankie to Glen Garry) (Side Roads) Order 201[ ]
The A9 Trunk Road (Killiecrankie to Glen Garry) (Extinguishment of Public Rights of Way) Order 201[ ]
The A9 Trunk Road (Killiecrankie to Glen Garry) Compulsory Purchase Order 201[ ]
- View The A9 Trunk Road (Killiecrankie to Glen Garry) Compulsory Purchase Order 201[ ] Schedule.pdf
- View CPO Drawing 001.pdf
- View CPO Drawing 002.pdf
- View CPO Drawing 003.pdf
- View CPO Drawing 004.pdf
- View CPO Drawing 005.pdf
- View CPO Drawing 006.pdf
- View CPO Drawing 007.pdf
- View CPO Drawing 008.pdf
- View CPO Drawing 009.pdf
- View CPO Drawing 010.pdf
- View CPO Drawing 011.pdf
- View CPO Drawing 012.pdf
- View CPO Drawing 013.pdf
Environmental Statement
Non-Technical Summary
Volume 1 – Main Report
- View Cover Contents Glossary and Abbreviations.pdf
- View Chapter 01 - Introduction.pdf
- View Chapter 02 - Need for the Scheme.pdf
- View Chapter 03 - Alternatives Considered.pdf
- View Chapter 04 - Iterative Design Development.pdf
- View Chapter 05 - The Proposed Scheme.pdf
- View Chapter 06 - Overview of Assessment Process.pdf
- View Chapter 07 - Consultation and Scoping.pdf
- View Chapter 08 - People and Communities - Community and Private Assets.pdf
- View Chapter 09 - People and Communities - All Travellers.pdf
- View Chapter 10 - Geology Soils Contaminated Land and Groundwater.pdf
- View Chapter 11 - Road Drainage and the Water Environment.pdf
- View Chapter 12 - Ecology and Nature Conservation.pdf
- View Chapter 13 - Landscape.pdf
- View Chapter 14 - Visual.pdf
- View Chapter 15 - Cultural Heritage.pdf
- View Chapter 16 - Air Quality.pdf
- View Chapter 17 - Noise and Vibration.pdf
- View Chapter 18 - Materials.pdf
- View Chapter 19 - Policies and Plans.pdf
- View Chapter 20 - Cumulative Impacts.pdf
- View Chapter 21 - Schedule of Environmental Commitments.pdf
- View Chapter 22 - Summary of Significant Residual Impacts.pdf
Volume 2 – Technical Appendices
- View Cover and Contents.pdf
- View Appendix A2.1 - Strategic Environmental Design Principles.pdf
- View Appendix A2.2 - Strategic Environmental Assessment (SEA) Monitoring Framework.pdf
- View Appendix A5.1 - Construction Information.pdf
- View Appendix A7.1 - Engaging Communities Booklet.pdf
- View Appendix A7.2 - Summary of Consultation Responses.pdf
- View Appendix A7.3 - Record of Determination.pdf
- View Appendix A8.1 - Land Capability Assessment Descriptors.pdf
- View Appendix A8.2 - Farm Business Survey.pdf
- View Appendix A8.3 - Forestry Survey.pdf
- View Appendix A8.4 - Development Land Assessment.pdf
- View Appendix A8.5 - Agriculture Forestry and Sporting Sensitvity Assessment.pdf
- View Appendix A8.6 - Agriculture Forestry and Sporting Land - Pre- and Post-Mitigation Impacts.pdf
- View Appendix A9.1 - Full Assessment Results for NMU Routes and Access to Outdoor Areas.pdf
- View Appendix A9.2 - View from the Road Impact Assessment.pdf
- View Appendix A10.1 - Contaminated Land Sources.pdf
- View Appendix A10.2 - Ecology Receptors with Potential Groundwater Component.pdf
- View Appendix A10.3 - Potential Impacts on Infrastructure Properties and Cultural Heritage.pdf
- View Appendix A10.4 - Surface Water Indirect Dewatering Assessment.pdf
- View Appendix A10.5 - Contaminated Land Indirect Impact Assessment.pdf
- View Appendix A11.1 - Baseline Conditions.pdf
- View Appendix A11.2 - Surface Water Hydrology.pdf
- View Appendix A11.3 - Flood Risk Assessment.pdf
- View Appendix A11.4 - Hydraulic Modelling Report.pdf
- View Appendix A11.5 - Fluvial Geomorphology.pdf
- View Appendix A11.6 - Water Quality.pdf
- View Appendix A11.7 - Residual Impact Tables.pdf
- View Appendix A11.8 - Watercourse Crossings Report - Figures Part 1 of 5.pdf
- View Appendix A11.8 - Watercourse Crossings Report - Figures Part 2 of 5.pdf
- View Appendix A11.8 - Watercourse Crossings Report - Figures Part 3 of 5.pdf
- View Appendix A11.8 - Watercourse Crossings Report - Figures Part 4 of 5.pdf
- View Appendix A11.8 - Watercourse Crossings Report - Figures Part 5 of 5.pdf
- View Appendix A11.8 - Watercourse Crossings Report - Main Report.pdf
- View Appendix A12.1 - Scientific Names.pdf
- View Appendix A12.2 - Baseline Data and Detailed Survey Methods.pdf
- View Appendix A12.3 - Confidential Ecology Features.pdf
- View Appendix A13.1 - Landscape Character Areas.pdf
- View Appendix A13.2 - Special Qualities of the Cairngorms National Park.pdf
- View Appendix A13.3 - Special Qualities of the Local Tummel NSA.pdf
- View Appendix A13.4 - Assessment of Residual Indirect Impacts.pdf
- View Appendix A13.5 - Strategic Environmental Design Principles - Landscape.pdf
- View Appendix A13.6 - Landscape Objectives.pdf
- View Appendix A13.7 - SuDS Design Principles.pdf
- View Appendix A14.1 - Built Receptor Assessment.pdf
- View Appendix A14.2 - Outdoor Receptor Assessment.pdf
- View Appendix A15.1 - Cultural Heritage Desk Based Study.pdf
- View Appendix A15.2 - Shierglas Farmhouse Structural Overview.pdf
- View Appendix A15.3 - Geophysical Survey Results.pdf
- View Appendix A15.4 - Cultural Heritage Impact Mitigation and Residual Impact Tables.pdf
- View Appendix A16.1 - Air Quality Annexes.pdf
- View Appendix A17.1 - Noise and Vibration Terminology.pdf
- View Appendix A17.2 - Detailed Baseline Noise Survey Results.pdf
- View Appendix A17.3 - Predicted Noise Levels at Noise Sensitive Receptors.pdf
- View Appendix A17.4 - Noise Impacts on Committed Developments.pdf
- View Appendix A17.5 - Noise Impacts on Amenity Areas.pdf
- View Appendix A17.6 - Residual Noise Impacts.pdf
- View Appendix A17.7 - Noise Senitive Receptors Closest to Construction Works.pdf
- View Appendix A19.1 - Planning Policy Context for Environmental Assessment.pdf
- View Appendix A19.2 - Assessment of Development Plan Policy Compliance.pdf
Volume 3 – Figures
- View Cover and Contents.pdf
- View Figure 1.1 - A9 Birnam to Glen Garry Overview.pdf
- View Figure 1.2 - A9 Killiecrankie to Glen Garry Overview.pdf
- View Figure 3.1 - DMRB Stage 2 Killiecrankie to Pitagowan Options.pdf
- View Figure 3.2 - DMRB Stage 2 Killiecrankie to Pitagowan Junction Variants.pdf
- View Figure 3.3 - DMRB Stage 2 Pitagowan to Glen Garry Options.pdf
- View Figure 3.4 - DMRB Stage 2 Pitagowan to Glen Garry Junction Variants.pdf
- View Figure 5.1a-k - DMRB Stage 3 Proposed Scheme with Environmental Constraints.pdf
- View Figure 5.2 - Essangal Underbridge.pdf
- View Figure 5.3 - River Garry Underbridge.pdf
- View Figure 8.1a-h - Community Assets and Development Land.pdf
- View Figure 8.2a-h - Proposed Scheme Land-take.pdf
- View Figure 8.3a-g - Change in Vehicle Access.pdf
- View Figure 9.1a-k - Existing Non-Motorised User (NMU) Routes.pdf
- View Figure 9.2a-p - Potential Impacts on Non-motorised Users (NMU) Routes.pdf
- View Figure 9.3a-k - View from the Road.pdf
- View Figure 10.1a-h - Private Water Supplies.pdf
- View Figure 10.2a-h - Potential Contaminated Land.pdf
- View Figure 10.3a-h - Groundwater Dependent Terrestrial Ecosystems (GWDTE).pdf
- View Figure 10.4 - Coring Survey Locations.pdf
- View Figure 11.1a-h - Flood Risk.pdf
- View Figure 11.1a-h - Water Features.pdf
- View Figure 12.1a-h - Ecological Designations.pdf
- View Figure 12.2a-k - Phase 1 Habitat Survey.pdf
- View Figure 12.3a-b - Wildcats Habitat Suitability Model and Incidental Records.pdf
- View Figure 12.4a-h - Badger Survey Results (Confidential).pdf
- View Figure 12.5a-k - Bat Roost Survey Results.pdf
- View Figure 12.6a-k - Bat Activity Survey Results.pdf
- View Figure 12.7a-k - Breeding Birds Survey Results.pdf
- View Figure 12.8a-h - Otter Survey Results (Confidential).pdf
- View Figure 12.9a-d - Red Squirrel and Pine Marten Incidental Results.pdf
- View Figure 12.10a-k - Reptile Survey Results.pdf
- View Figure 12.11a-k - Updated Phase 1 Habitat Survey (2016) with BLOM Data.pdf
- View Figure 12.12 - Sensitive Bird Species Records (Confidential).pdf
- View Figure 12.13a-h - Aquatic Survey results.pdf
- View Figure 12.14a-h - Ancient Woodland Inventory (AWI) Loss and Compensation.pdf
- View Figure 13.1a-b - Landscape Designations and other associated Designations.pdf
- View Figure 13.2a-b - Landscape Character Plan.pdf
- View Figure 13.3a-b - Landscape Features Plan.pdf
- View Figure 13.4a-b - Visibility Analysis.pdf
- View Figure 13.5a-p - Landscape and Ecological Mitigation.pdf
- View Figure 13.6a-g - Cross Sections.pdf
- View Figure 13.7 - Typical Planting Structure.pdf
- View Figure 14.1a-b - Zone of Theoretical Visibility (ZTV) Analysis Existing A9.pdf
- View Figure 14.2a-b - Zone of Theoretical Visibility (ZTV) Analysis Proposed Scheme.pdf
- View Figure 14.3a-e - Visual Impact on Built Receptors.pdf
- View Figure 14.4a-d - Visual Impact on Outdoor Receptors.pdf
- View Figure 14.5a-b - Viewpoint Locations.pdf
- View Figure 14.6-14.19 - Visualisations.pdf
- View Figure 15.1a-h - Archaeological Remains and Historic Buildings.pdf
- View Figure 15.2a-c - Historic Landscape Types.pdf
- View Figure 15.3a-h - Potential for Unknown Archaeological Remains.pdf
- View Figure 15.4a-b - Killiecrankie Battlefield Special Qualities and Landscape Characteristics.pdf
- View Figure 16.1 - Location of Construction Assessment Study Area and Receptors.pdf
- View Figure 16.2a-h - Air Quality Locations of Selected Sensitive Receptors.pdf
- View Figure 16.3a-e - Air Quality Monitoring Sites.pdf
- View Figure 17.1 - Noise and Vibration Study Area and Calculation Area.pdf
- View Figure 17.2a-c - Baseline Noise Monitoring Locations and Sample Receptors.pdf
- View Figure 17.3a-h - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Minimum Future Assessment Year.pdf
- View Figure 17.4a-h - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Minimum Future Assessment Year.pdf
- View Figure 17.5a-h - Noise Level Diferrence Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year.pdf
- View Figure 17.6a-h - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year.pdf
- View Figure 17.7a-h - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Future Assessment Year.pdf
- View Figure 17.8a-h - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Something Future Assessment Year.pdf
- View Figure 17.9 - Locations of Receptor Specific Noise Mitigation.pdf
- View Figure 17.10a-h - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year (with Mitigation).pdf
- View Figure 17.11a-h - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Something Baseline Year (with Mitigation).pdf
- View Figure 17.12a-h - Noise Level Difference Contour Map (Ground Floor) Do-Minimum Baseline Year Vs Do-Something Future Assessment Year (with Mitigation).pdf
- View Figure 17.13a-h - Noise Level Difference Contour Map (First Floor) Do-Minimum Baseline Year Vs Do-Somethng Future Assessment Year (with Mitigation).pdf
- View Figure 18.1 - Materials and Waste Baseline.pdf
- View Figure 19.1a-h - Planning Authority Boundaries.pdf
Published Date
28 Nov 2017
Type
Projects
Mode of transport